共 50 条
- [41] Utilizing artificial intelligence to solving time – cost – quality trade-off problem Scientific Reports, 12
- [42] Time-cost trade-off of construction project based on ant colony algorithm Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111
- [44] Uncertain Time-Resource-Cost Trade-Off Models for Construction Project Schedule KSCE Journal of Civil Engineering, 2021, 25 : 2771 - 2778
- [45] A Developmental Genetic Approach to the cost/time trade-off in Resource Constrained Project Scheduling FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2014, 2014, 2 : 171 - 179
- [47] Trade-off model among time, quality and cost for business process reengineering Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2002, 8 (04): : 269 - 273
- [48] Multi-project Scheduling: Multicriteria Time-cost Trade-off Problem PROCEEDINGS OF THE 13TH INTERNATIONAL SYMPOSIUM INTELLIGENT SYSTEMS 2018 (INTELS'18), 2019, 150 : 237 - 243
- [49] Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (01): : 65 - 71
- [50] Time and cost trade-off management for scheduling parallel applications on Utility Grids FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF GRID COMPUTING-THEORY METHODS AND APPLICATIONS, 2010, 26 (08): : 1344 - 1355