Time, cost and quality trade-off in project management: A case study

被引:0
|
作者
Asia Inst of Technology, Bangkok, Thailand [1 ]
机构
来源
Int J Proj Manage | / 4卷 / 249-256期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Genetic Algorithms for Construction Time-Cost-Quality Trade-Off: A Road Project Case Study
    Sorrentino, Mariarosa
    IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2013, 4 (02): : 163 - 176
  • [2] Study on trade-off of time-cost-quality in construction project based on BIM
    Xu Yongge
    Wei Ya
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
  • [3] A ROBUST TIME-COST-QUALITY-ENERGY-ENVIRONMENT TRADE-OFF WITH RESOURCE-CONSTRAINED IN PROJECT MANAGEMENT: A CASE STUDY FOR A BRIDGE CONSTRUCTION PROJECT
    Lotfi, Reza
    Yadegari, Zahra
    Hosseini, Seyed Hossein
    Khameneh, Amir Hossein
    Tirkolaee, Erfan Babaee
    Weber, Gerhard-Wilhelm
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2022, 18 (01) : 375 - 396
  • [4] An Integer Grey Goal Programming For Project Time, Cost and Quality Trade-Off
    Hajiagha, Seyed Hossein Razavi
    Akrami, Hadi
    Hashemi, Shide Sadat
    Mahdiraji, Hannan Amoozad
    INZINERINE EKONOMIKA-ENGINEERING ECONOMICS, 2015, 26 (01): : 93 - 100
  • [5] Time-Quality-Cost Trade-Off Optimization and Application in Engineering Project
    Dong Na
    Liang Chuan
    Guo Chun-xiang
    Zou Zuo-jing
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1597 - +
  • [6] Fuzzy trade-off of time-cost-quality in construction project and Pareto solution
    Zhang, Lianying
    Yue, Yan
    Tongji Daxue Xuebao/Journal of Tongji University, 2013, 41 (02): : 303 - 308
  • [7] A MULTI-OBJECTIVE MODEL FOR TIME-COST-QUALITY-RISK TRADE-OFF PROBLEMS IN PROJECT MANAGEMENT
    Avsar, Melis Mine Sener
    Onut, Semih
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2022, 29 (06): : 826 - 838
  • [8] On the discrete time, cost and quality trade-off problem
    Tareghian, Hamed R.
    Taheri, Seyyed Hassan
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 181 (02) : 1305 - 1312
  • [9] Time-Cost-Quality Trade-Off in a Broiler Production Project Using Meta-Heuristic Algorithms: A Case Study
    Moghadam, Erfan Khosravani
    Sharifi, Mohammad
    Rafiee, Shahin
    Chang, Young Ki
    AGRICULTURE-BASEL, 2020, 10 (01):
  • [10] Application of time-cost trade-off model in forest management projects: The case of Oak decline project
    Zandebasiri, Mehdi
    Vacik, Harald
    Etongo, Daniel
    Dorfstetter, Yasmin
    Soosani, Javad
    Pourhashemi, Mehdi
    JOURNAL OF FOREST SCIENCE, 2019, 65 (12) : 481 - 492