Emergency schedule in the risk assessment of the construction project

被引:0
|
作者
Skorupka, Dariusz [1 ]
机构
[1] Wydzial Naukowo-Badawczy, Wyzsza Szkola Oficerska Wojsk LĄdowych, Wroclawiu
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The article describes the problem of scheduling and analyzing the risk of construction projects. It depicts the issues encountered while assessing the risk of construction work projects. It has been concluded that a reliable assessment of this phenomenon lies in a diligent identification and quantification of risk indicators. The article also presents the measures of risk. In addition, it describes the methods and tools used for the risk assessment of construction work projects and how to put them in schedule.
引用
收藏
页码:299 / 306
相关论文
共 50 条
  • [21] Research on Risk Assessment of Port Project Investment and Construction
    Xu, Xiaoyang
    Yang, Zhengrong
    Jin, Lifu
    Hao, Lizhong
    JOURNAL OF COASTAL RESEARCH, 2020, : 187 - 189
  • [22] Study on Construction Project Bidding Risk Assessment Model
    Wen Guo-feng
    Chen Li-wen
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 210 - 214
  • [23] Risk Assessment in Construction Project Using Statistic Approach
    Dziadosz, Agnieszka
    Rejment, Mariusz
    INTERNATIONAL CONFERENCE ON NUMERICAL ANALYSIS AND APPLIED MATHEMATICS (ICNAAM-2018), 2019, 2116
  • [24] Multi-criteria risk assessment of a construction project
    Tamosaitiene, Jolanta
    Zavadskas, Edmundas Kazimieras
    Turskis, Zenonas
    FIRST INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2013, 17 : 129 - 133
  • [25] Schedule Compression Impact on Construction Project Safety
    Webb, Curt
    Gao, Lu
    Song, Ling-guang
    FRONTIERS OF ENGINEERING MANAGEMENT, 2015, 2 (04) : 344 - 350
  • [26] Schedule Compression Impact on Construction Project Safety
    Curt Webb
    Lu Gao
    Ling-guang Song
    Frontiers of Engineering Management, 2015, 2 (04) : 344 - 350
  • [27] Study of Optimizing Procedure for Project Construction Schedule
    Cao Jianzhong
    Lu Husheng
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1781 - 1784
  • [28] Schedule quality evaluation for Construction Project Management
    Bragadin, Marco Alvise
    Kahkonen, Kalle
    TECHNE-JOURNAL OF TECHNOLOGY FOR ARCHITECTURE AND ENVIRONMENT, 2020, 20 : 175 - 183
  • [29] Agent-Based Modeling and Simulation of Project Schedule Risk Analysis in the Construction Industry
    ElGindi, Mohamed
    Harb, Sara
    Abdullah, Abdelhamid
    Essawy, Yasmeen A. S.
    Nassar, Khaled
    PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 1, CSCE 2022, 2023, 363 : 493 - 511
  • [30] Research on risk analysis for construction project schedule and cost based on Monte Carlo simulation
    Zhong Zuowei
    Xi Bao
    Huang Qiugu
    Yang Shihua
    Li Fangzhen
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 857 - 861