共 50 条
- [41] The risk assessment model of BT construction engineering project financing ENGINEERING AND RISK MANAGEMENT, 2011, 1 : 169 - 173
- [42] Construction Project Risk Assessment Using Combined Fuzzy and FMEA PROCEEDINGS OF THE 2013 JOINT IFSA WORLD CONGRESS AND NAFIPS ANNUAL MEETING (IFSA/NAFIPS), 2013, : 232 - 237
- [44] Risk analysis and post assessment of resettlement for water project construction 2005, China Water Power Press, Nanjing, China (36):
- [46] The researches on the optimization of overall construction schedule for railway project PROCEEDINGS OF '97 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, 1997, : 182 - 186
- [47] Optimization for limited resource schedule in public construction project FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 1639 - 1643
- [50] A Simulation Approach based Project Schedule Assessment SIMULTECH: PROCEEDINGS OF THE 9TH INTERNATIONAL CONFERENCE ON SIMULATION AND MODELING METHODOLOGIES, TECHNOLOGIES AND APPLICATIONS, 2019, 2019, : 422 - 428