Emergency schedule in the risk assessment of the construction project

被引:0
|
作者
Skorupka, Dariusz [1 ]
机构
[1] Wydzial Naukowo-Badawczy, Wyzsza Szkola Oficerska Wojsk LĄdowych, Wroclawiu
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The article describes the problem of scheduling and analyzing the risk of construction projects. It depicts the issues encountered while assessing the risk of construction work projects. It has been concluded that a reliable assessment of this phenomenon lies in a diligent identification and quantification of risk indicators. The article also presents the measures of risk. In addition, it describes the methods and tools used for the risk assessment of construction work projects and how to put them in schedule.
引用
收藏
页码:299 / 306
相关论文
共 50 条
  • [31] Information management model of construction schedule risk of high-speed railway project
    Liu, Weiqing
    Chen, Tingru
    Wei, Wanbing
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 426 - 430
  • [32] Study on BIM-based construction project cost and schedule risk early warning
    Sun, Chengshuang
    Man, Qingpeng
    Wang, Yaowu
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 29 (02) : 469 - 477
  • [33] Study on schedule risk assessment of power transmission and transformation project based on improved risk chain
    Liu, Qin
    Yin, Chen
    Chen, Bingqian
    2020 5TH INTERNATIONAL CONFERENCE ON RENEWABLE ENERGY AND ENVIRONMENTAL PROTECTION, 2020, 621
  • [34] Incorporating Project Complexities in Risk Assessment: Case of an Airport Expansion Construction Project
    Andringa, Lise
    Okmen, Onder
    Leijten, Martijn
    Bosch-Rekveldt, Marian
    Bakker, Hans
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2022, 38 (06)
  • [35] Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model
    Nasir, D
    McCabe, B
    Hartono, L
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (05): : 518 - 527
  • [36] Research on Risk Management of Project Schedule
    Liu, Jinling
    KNOWLEDGE DISCOVERY AND DATA MINING, 2012, 135 : 397 - 404
  • [37] Construction of Risk Identification and Assessment Index System of Logistics Park Construction Project
    Qi, He
    PROCEEDINGS OF 2016 2ND INTERNATIONAL CONFERENCE ON HUMANITIES AND SOCIAL SCIENCE RESEARCH (ICHSSR 2016), 2016, 70 : 6 - 9
  • [38] A Proactive Risk Assessment Framework to Maximize Schedule Benefits of Modularization in Construction Projects
    Nabi, Mohamad Abdul
    El-adaway, Islam H.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (07)
  • [39] Schedule health assessment of construction projects
    Bragadin, Marco Alvise
    Kahkonen, Kalle
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2016, 34 (12) : 875 - 897
  • [40] Safety Risk Assessment of Power Construction Project Based on the Vulnerability
    Yang, Taihua
    Zheng, Qinghua
    Wang, Yang
    Liu, Rui
    2ND INTERNATIONAL CONFERENCE ON NEW ENERGY AND RENEWABLE RESOURCES (ICNERR 2017), 2017, : 108 - 112