An extension of the earned value management to improve the accuracy of schedule analysis results

被引:0
|
作者
Najafi, Amir [1 ]
Azimi, Fatemeh [2 ]
机构
[1] Islamic Azad Univ, Qazvin Branch, Fac Ind & Mech Engn, Qazvin, Iran
[2] Islamic Azad Univ, Qazvin Branch, Dept Math, Qazvin, Iran
关键词
Earned value; Project delay; Project management; Schedule analysis;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A project is any endeavor involving planned action, for example, developing a new product or constructing a dam. Major factors for a project to be successful are applying performance measurement and feedback tool. One such well-known performance measurement tool to control the project execution is earned value management (EVM). EVM uses the fundamental principle that trends in the past can be good predictors of the future. It was originally developed to follow time and cost of a project, but it has some weak points in analyzing the time performance of a project. In this article, we first explain these weak points in detail. Then, to improve them, we develop two methods: the first one is a simple and approximation method to minimize errors in EVM analysis with a high probability and the second method is an exact approach that uses earned value and floating time concepts. At the end, the performance of the proposed methods is evaluated and analyzed on a set of instances containing a variety of project sizes. The results of this experimentation show that the efficiency of the methods is relatively good.
引用
收藏
页码:63 / 75
页数:13
相关论文
共 50 条
  • [31] Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities
    de Andrade, Paulo Andre
    Martens, Annelies
    Vanhoucke, Mario
    AUTOMATION IN CONSTRUCTION, 2019, 99 : 68 - 78
  • [32] Using earned-value analysis for better project management
    Hayes, HB
    Miller, J
    BIOPHARM-THE APPLIED TECHNOLOGIES OF BIOPHARMACEUTICAL DEVELOPMENT, 2002, 15 (03): : 58 - 59
  • [33] Improvement and application of earned value analysis in coal project management
    Zhong, Shuheng
    Wang, Xin
    ISMSSE 2011, 2011, 26
  • [34] Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management
    Barrientos-Orellana, Alexis
    Ballesteros-Perez, Pablo
    Mora-Melia, Daniel
    Cerezo-Narvaez, Alberto
    Gutierrez-Bahamondes, Jimmy H.
    BUILDINGS, 2023, 13 (05)
  • [35] A Systematic Review of Earned Value Management Methods for Monitoring and Control of Project Schedule Performance: An AHP Approach
    Mayo-Alvarez, Luis
    Alvarez-Risco, Aldo
    Del-Aguila-Arcentales, Shyla
    Sekar, M. Chandra
    Yanez, Jaime A.
    SUSTAINABILITY, 2022, 14 (22)
  • [36] Quantified Benefits of Earned Value Management
    Jones, Matthew Evans
    2023 IEEE AEROSPACE CONFERENCE, 2023,
  • [37] PROJECT COST ESTIMATE AT COMPLETION: EARNED VALUE MANAGEMENT VERSUS EARNED SCHEDULE-BASED REGRESSION MODELS. A COMPARATIVE ANALYSIS OF THE MODELS APPLICATION IN THE CONSTRUCTION PROJECTS IN ROMANIA
    Simion, Cezar-Petre
    Marin, Irinel
    ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2018, 52 (03): : 205 - 216
  • [38] Incorporating earned value management into income statements to improve project management profitability and elevate application in the business and management
    Setyopurnomo, Rudy
    Wiryono, Sudarso Kaderi
    Lestari, Yuliani Dwi
    Sukarno, Subiakto
    PLOS ONE, 2025, 20 (01):
  • [39] Dangers in using earned duration and other earned value metrics to measure a project's schedule performance
    Wendell, Richard E.
    Lowe, Timothy J.
    Gordon, Mike M.
    CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2023, 31 (02) : 665 - 680
  • [40] A Proposal to Improve the Earned Value Management Technique Using Quality Data in Software Projects
    Lima Francisco, Christopher de Souza
    de Souza, Adler Diniz
    16TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY-NEW GENERATIONS (ITNG 2019), 2019, 800 : 593 - 600