Simulation of tunnel boring machine utilization: A case study

被引:9
|
作者
Moosazadeh, S. [1 ]
Aghababaie, H. [1 ]
Hoseinie, S. H. [2 ]
Ghodrati, B. [3 ]
机构
[1] Sahand Univ Technol, Fac Min Engn, Tabriz, Iran
[2] Isfahan Univ Technol, Dept Min Engn, Esfahan, Iran
[3] Lulea Univ Technol, Div Operat & Maintenance Engn, Lulea, Sweden
来源
JOURNAL OF MINING AND ENVIRONMENT | 2018年 / 9卷 / 01期
关键词
Tunnel Boring Machine; Utilization; Simulation; Down Time;
D O I
10.22044/jme.2017.5707.1384
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simulation approach. For this purpose, the unit operation during one working shift such as boring time, ring building time, and locomotive travel time was recorded and saved in data base. In addition, the general down times such as TBM and back-up system maintenance, surface and tunnel logistic maintenance, cutting tools' replacement, and locomotive delay times were recorded and considered in simulation. The results of this work show that the mean simulated project duration time of case study TBM is approximately 859 shifts and close to the real data with a difference of 0.92%. Finally, the average estimated utilization factor was found to be approximately 14%.
引用
收藏
页码:53 / 60
页数:8
相关论文
共 50 条
  • [41] Dynamics Simulation of a Six-DOF Tunnel Segment Erector for Tunnel Boring Machine Based on Virtual Prototype
    Li, Gang
    Chen, Yadong
    Wang, Bo
    Wang, Wanshan
    NEW TRENDS IN MECHANICAL ENGINEERING AND MATERIALS, 2013, 251 : 231 - 234
  • [42] Clogging of slurry-shield tunnel-boring machine drives in sedimentary soft rock: A case study
    CAO Chengyong
    CHEN Xiangsheng
    SHI Chenghua
    FU Yanbin
    GONG Chenjie
    WANG Zuxian
    Frontiers of Structural and Civil Engineering, 2023, 17 (10) : 1502 - 1516
  • [43] Case study: using the point load test to estimate rock strength of tunnels constructed by a tunnel boring machine
    Liu, Quan-Sheng
    Zhao, Yi-Fan
    Zhang, Xiao-Ping
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2019, 78 (03) : 1727 - 1734
  • [44] Clogging of slurry-shield tunnel-boring machine drives in sedimentary soft rock: A case study
    Chengyong Cao
    Xiangsheng Chen
    Chenghua Shi
    Yanbin Fu
    Chenjie Gong
    Zuxian Wang
    Frontiers of Structural and Civil Engineering, 2023, 17 : 1502 - 1516
  • [45] Clogging of slurry-shield tunnel-boring machine drives in sedimentary soft rock: A case study
    Cao, Chengyong
    Chen, Xiangsheng
    Shi, Chenghua
    Fu, Yanbin
    Gong, Chenjie
    Wang, Zuxian
    FRONTIERS OF STRUCTURAL AND CIVIL ENGINEERING, 2023, 17 (10) : 1502 - 1516
  • [46] Case study: using the point load test to estimate rock strength of tunnels constructed by a tunnel boring machine
    Quan-Sheng Liu
    Yi-Fan Zhao
    Xiao-Ping Zhang
    Bulletin of Engineering Geology and the Environment, 2019, 78 : 1727 - 1734
  • [47] Rock mechanical viewpoint on excavanion of pressure tunnel by tunnel boring machine
    Nishida, T.
    Matsumura, Y.
    Miyanaca, Y.
    Hori, M.
    ISRM International Symposium, IS 1982, 1982, : 815 - 826
  • [48] Imaging ahead of a tunnel boring machine with DC resistivity: A laboratory and numerical study
    Mifkovic, Max
    Swidinsky, Andrei
    Mooney, Michael
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 108
  • [49] A study on starting characteristic and improvement for high power motor with tunnel boring machine
    Kim T.-K.
    An J.-Y.
    Transactions of the Korean Institute of Electrical Engineers, 2019, 68 (01): : 44 - 51
  • [50] SEISMIC ANALYSIS OF TUNNEL BORING MACHINE SIGNALS AT KERCKHOFF TUNNEL.
    Greenfield, Roy J.
    Miscellaneous Paper - US Army Engineer Waterways Experiment Station, 1983, (GL-83-19):