Simulation of tunnel boring machine utilization: A case study

被引:9
|
作者
Moosazadeh, S. [1 ]
Aghababaie, H. [1 ]
Hoseinie, S. H. [2 ]
Ghodrati, B. [3 ]
机构
[1] Sahand Univ Technol, Fac Min Engn, Tabriz, Iran
[2] Isfahan Univ Technol, Dept Min Engn, Esfahan, Iran
[3] Lulea Univ Technol, Div Operat & Maintenance Engn, Lulea, Sweden
来源
JOURNAL OF MINING AND ENVIRONMENT | 2018年 / 9卷 / 01期
关键词
Tunnel Boring Machine; Utilization; Simulation; Down Time;
D O I
10.22044/jme.2017.5707.1384
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simulation approach. For this purpose, the unit operation during one working shift such as boring time, ring building time, and locomotive travel time was recorded and saved in data base. In addition, the general down times such as TBM and back-up system maintenance, surface and tunnel logistic maintenance, cutting tools' replacement, and locomotive delay times were recorded and considered in simulation. The results of this work show that the mean simulated project duration time of case study TBM is approximately 859 shifts and close to the real data with a difference of 0.92%. Finally, the average estimated utilization factor was found to be approximately 14%.
引用
收藏
页码:53 / 60
页数:8
相关论文
共 50 条
  • [21] ADVANCEMENT SIMULATION OF TUNNEL BORING MACHINES
    Rahm, Tobias
    Sadri, Kambiz
    Koch, Christian
    Thewes, Markus
    Koenig, Markus
    2012 WINTER SIMULATION CONFERENCE (WSC), 2012,
  • [22] Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps - A case study Prasnna
    Jain, Prasnna
    Naithani, A. K.
    Singh, T. N.
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2014, 6 (01) : 36 - 47
  • [23] Predicting tunnel boring machine performance with the Informer model: a case study of the Guangzhou Metro Line project
    Zhao, Junxing
    Ding, Xiaobin
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2025, 26 (03): : 226 - 237
  • [24] Airflow inside tunnel boring machine: A numerical study and an experimental verification
    Nezarat, H. R.
    Jalali, S. M. E.
    Nazari, M.
    JOURNAL OF MINING AND ENVIRONMENT, 2019, 10 (03): : 623 - 632
  • [25] Tunnel boring machine carves out Queens Water Tunnel
    不详
    WATER-ENGINEERING & MANAGEMENT, 1997, 144 (09): : 13 - 13
  • [26] Theoretical and experimental study of tunnel boring machine dynamic cutting force
    Sun, Hao-kai
    Gao, Yang
    Zhu, Guang-xuan
    Xu, Fei
    Zheng, Xin-yu
    ROCK AND SOIL MECHANICS, 2023, 44 (06) : 1657 - 1670
  • [27] A Study on Vibration of Tunnel Boring Machine and the Induced Shield Tangential Force
    Zou, X. Y.
    Zheng, H.
    Mi, Y. Z.
    Xie, X.
    JOURNAL OF VIBRATION ENGINEERING & TECHNOLOGIES, 2016, 4 (04) : 373 - 381
  • [28] Probabilistic Evaluation of Tunnel Boring Machine Penetration Rate Based on Case Analysis
    Li, Guangkun
    Xue, Yiguo
    Su, Maoxin
    Qiu, Daohong
    Wang, Peng
    Liu, Qiushi
    Jiang, Xudong
    KSCE JOURNAL OF CIVIL ENGINEERING, 2022, 26 (11) : 4840 - 4850
  • [29] Probabilistic Evaluation of Tunnel Boring Machine Penetration Rate Based on Case Analysis
    Guangkun Li
    Yiguo Xue
    Maoxin Su
    Daohong Qiu
    Peng Wang
    Qiushi Liu
    Xudong Jiang
    KSCE Journal of Civil Engineering, 2022, 26 : 4840 - 4850
  • [30] A desktop virtual reality-based interactive tunnel boring machine simulation system
    School of Mechanical Engineering and Automation, Northeastern University, Shenyang, China
    Adv. Mater. Res., (957-960):