Simulation of tunnel boring machine utilization: A case study

被引:9
|
作者
Moosazadeh, S. [1 ]
Aghababaie, H. [1 ]
Hoseinie, S. H. [2 ]
Ghodrati, B. [3 ]
机构
[1] Sahand Univ Technol, Fac Min Engn, Tabriz, Iran
[2] Isfahan Univ Technol, Dept Min Engn, Esfahan, Iran
[3] Lulea Univ Technol, Div Operat & Maintenance Engn, Lulea, Sweden
来源
JOURNAL OF MINING AND ENVIRONMENT | 2018年 / 9卷 / 01期
关键词
Tunnel Boring Machine; Utilization; Simulation; Down Time;
D O I
10.22044/jme.2017.5707.1384
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simulation approach. For this purpose, the unit operation during one working shift such as boring time, ring building time, and locomotive travel time was recorded and saved in data base. In addition, the general down times such as TBM and back-up system maintenance, surface and tunnel logistic maintenance, cutting tools' replacement, and locomotive delay times were recorded and considered in simulation. The results of this work show that the mean simulated project duration time of case study TBM is approximately 859 shifts and close to the real data with a difference of 0.92%. Finally, the average estimated utilization factor was found to be approximately 14%.
引用
收藏
页码:53 / 60
页数:8
相关论文
共 50 条
  • [31] Numerical simulation on effects of embedded crack on rock fragmentation by a tunnel boring machine cutter
    Liu Jie
    Cao Ping
    Jiang Zhe
    Zhao Yan-lin
    Cao Ri-hong
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (08) : 3302 - 3308
  • [32] RETRACTION: Modelling and Simulation of Surfacing Welding Remanufacturing for Tunnel Boring Machine Disc Cutter
    Puoza, Julius Caesar
    Uba, Felix
    WELDING INTERNATIONAL, 2022, 36 (02) : 128 - 128
  • [33] Numerical Simulation of Rock-breaking Process by Disc Cutter in Tunnel Boring Machine
    Zhang, Yu
    Wang, Xingwen
    Liu, Huifang
    MECHANICAL STRUCTURES AND SMART MATERIALS, 2014, 487 : 513 - 516
  • [34] Development of a Digital Mockup for Tunnel Boring Machine
    Cheng, Jun
    Gong, Yadong
    Xu, Yongqiang
    Zhi, Di
    E-ENGINEERING & DIGITAL ENTERPRISE TECHNOLOGY VII, PTS 1 AND 2, 2009, 16-19 : 769 - 775
  • [35] Seismic imaging ahead of the tunnel boring machine
    Kneib, G
    ACOUSTICAL IMAGING, VOL 27, 2004, 27 : 391 - 398
  • [36] Advances in tunnel boring machine application in china
    North China Institute of Water Conservancy and Hydroelectric Power, Zhengzhou 450011, China
    不详
    Yanshilixue Yu Gongcheng Xuebao, 2007, 2 (226-238):
  • [37] A Desktop Virtual Reality-based Interactive Tunnel Boring Machine Simulation System
    Li, Gang
    Cao, Yan
    Yao, Yu
    Wang, Wanshan
    MANUFACTURING ENGINEERING AND AUTOMATION I, PTS 1-3, 2011, 139-141 : 957 - 960
  • [38] Numerical simulation on effects of embedded crack on rock fragmentation by a tunnel boring machine cutter
    Jie Liu
    Ping Cao
    Zhe Jiang
    Yan-lin Zhao
    Ri-hong Cao
    Journal of Central South University, 2014, 21 : 3302 - 3308
  • [39] Numerical simulation on effects of embedded crack on rock fragmentation by a tunnel boring machine cutter
    刘杰
    曹平
    蒋喆
    赵延林
    曹日红
    Journal of Central South University, 2014, 21 (08) : 3302 - 3308
  • [40] Performance calculation for Tunnel Boring Machine motors
    Sutherland, PE
    IAS 2000 - CONFERENCE RECORD OF THE 2000 IEEE INDUSTRY APPLICATIONS CONFERENCE, VOLS 1-5, 2000, : 2668 - 2673