Simulation of tunnel boring machine utilization: A case study

被引:9
|
作者
Moosazadeh, S. [1 ]
Aghababaie, H. [1 ]
Hoseinie, S. H. [2 ]
Ghodrati, B. [3 ]
机构
[1] Sahand Univ Technol, Fac Min Engn, Tabriz, Iran
[2] Isfahan Univ Technol, Dept Min Engn, Esfahan, Iran
[3] Lulea Univ Technol, Div Operat & Maintenance Engn, Lulea, Sweden
来源
JOURNAL OF MINING AND ENVIRONMENT | 2018年 / 9卷 / 01期
关键词
Tunnel Boring Machine; Utilization; Simulation; Down Time;
D O I
10.22044/jme.2017.5707.1384
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simulation approach. For this purpose, the unit operation during one working shift such as boring time, ring building time, and locomotive travel time was recorded and saved in data base. In addition, the general down times such as TBM and back-up system maintenance, surface and tunnel logistic maintenance, cutting tools' replacement, and locomotive delay times were recorded and considered in simulation. The results of this work show that the mean simulated project duration time of case study TBM is approximately 859 shifts and close to the real data with a difference of 0.92%. Finally, the average estimated utilization factor was found to be approximately 14%.
引用
收藏
页码:53 / 60
页数:8
相关论文
共 50 条
  • [1] SIMULATION CASE STUDY: MODELLING DISTINCT BREAKDOWN EVENTS FOR A TUNNEL BORING MACHINE EXCAVATION
    Werner, Michael
    AbouRizk, Simaan
    2015 WINTER SIMULATION CONFERENCE (WSC), 2015, : 3234 - 3245
  • [2] Research on simulation of tunnel boring machine based on virtual prototype
    Gong Y.
    Cheng J.
    International Journal of Internet Manufacturing and Services, 2010, 2 (3-4) : 310 - 329
  • [3] Simulation analysis of rock braking mechanism of tunnel boring machine
    Simulacijska analiza mehanizma loma stijena stroja za bušenje tunela
    2016, Strojarski Facultet (23):
  • [4] SIMULATION ANALYSIS OF ROCK BRAKING MECHANISM OF TUNNEL BORING MACHINE
    Zhu, Lida
    Wei, Tianhua
    Liu, Baoguang
    Yu, Tianbiao
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2016, 23 (06): : 1585 - 1590
  • [5] Development and Application of a Virtual Simulation System for Tunnel Boring Machine
    Cheng Jun
    Gong Yadong
    SECOND INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN, VOL 1, PROCEEDINGS, 2009, : 562 - 565
  • [6] Research of Simulation for Tunnel Boring Machine Based on Virtual Reality
    Cheng Jun
    Gong Yadong
    Yang Jianyu
    2009 INTERNATIONAL CONFERENCE ON NEW TRENDS IN INFORMATION AND SERVICE SCIENCE (NISS 2009), VOLS 1 AND 2, 2009, : 1038 - 1041
  • [7] Kinematic/Dynamic Simulation of Gear System of Tunnel Boring Machine
    Zhu, Lida
    Zhao, Haifeng
    Zhang, Mingliang
    Wang, Wanshan
    INTELLIGENT STRUCTURE AND VIBRATION CONTROL, PTS 1 AND 2, 2011, 50-51 : 400 - +
  • [8] Tunnel boring machine development
    Herrenknecht, Martin
    Baeppler, Karin
    NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 52 - +
  • [9] Numerical Simulation of Rock Breaking by Disc Cutter of Tunnel Boring Machine
    Wu, Qixing
    An, Guanfeng
    Zhou, Xiaowen
    Chen, Lin
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING III, PT 1, 2014, 638-640 : 888 - +
  • [10] Numerical Simulation Study on the Mechanical Properties of the Surrounding Rock in Tunnel Boring Machine Inclined Shaft
    Liu L.
    Yan J.
    Cao S.
    Journal of Engineering Science and Technology Review, 2024, 17 (01) : 30 - 36