CONSTRUCTION TIME-COST TRADE-OFF ANALYSIS USING LP/IP HYBRID METHOD

被引:85
|
作者
LIU, L
BURNS, SA
FENG, CW
机构
[1] Dept. of Civ. Engrg., Univ. of Illinois at Urbana-Champaign, Urbana, IL, 61801
[2] Dept. of General Engrg., Univ. of Illinois at UrbanaChampaign, Urbana, IL
关键词
D O I
10.1061/(ASCE)0733-9364(1995)121:4(446)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction planners must select appropriate resources, including crew size, equipment, methods, and technologies, to perform the tasks of a construction project. In general, there is a trade-off between time and cost to complete a task-the less expensive the resources, the longer it takes. Using critical-path-method techniques, the overall project cost can be reduced by using less expensive resources for noncritical activities without impacting the duration. Furthermore planners usually need to adjust the selection of resources in order to shorten or lengthen the project duration. Finding optimal decisions is difficult and time-consuming considering the numbers of permutations involved. For example, a critical-path-method network with only eight activities, each with two options, will have 256 (2(8)) alternatives. Exhaustive enumeration is not economically feasible even with very fast computers. This paper presents a new algorithm using linear and integer programming to efficiently obtain optimal resource selections that optimize time and cost of a construction project.
引用
收藏
页码:446 / 454
页数:9
相关论文
共 50 条
  • [41] Augmented Time-Cost Trade-Off Optimization Using Particle Swarm Optimization
    Turkoglu, Harun
    Arditi, David
    Polat, Gul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (05)
  • [42] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES - CLOSURE
    REDA, R
    CARR, RI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 375 - 376
  • [43] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES - DISCUSSION
    HANSCOM, GB
    WAUGH, L
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 374 - 375
  • [44] Network Analysis Algorithm for the Solution of Discrete Time-Cost Trade-off Problem
    Bettemir, Onder Halis
    Birgonul, M. Talat
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (04) : 1047 - 1058
  • [45] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [46] Time-cost Trade-off Relations in Bulk Transportation Problem
    Gupta, A.
    Verma, V.
    Puri, M. C.
    Journal of Information & Optimization Sciences, 16 (02):
  • [47] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [48] Systematic solution procedure for time-cost trade-off problems
    Udosen, Udosen J.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (02): : 158 - 168
  • [49] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [50] Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
    Yilmaz, Mehmet
    Dede, Tayfun
    STRUCTURES, 2023, 48 : 798 - 808