CONSTRUCTION TIME-COST TRADE-OFF ANALYSIS USING LP/IP HYBRID METHOD

被引:85
|
作者
LIU, L
BURNS, SA
FENG, CW
机构
[1] Dept. of Civ. Engrg., Univ. of Illinois at Urbana-Champaign, Urbana, IL, 61801
[2] Dept. of General Engrg., Univ. of Illinois at UrbanaChampaign, Urbana, IL
关键词
D O I
10.1061/(ASCE)0733-9364(1995)121:4(446)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction planners must select appropriate resources, including crew size, equipment, methods, and technologies, to perform the tasks of a construction project. In general, there is a trade-off between time and cost to complete a task-the less expensive the resources, the longer it takes. Using critical-path-method techniques, the overall project cost can be reduced by using less expensive resources for noncritical activities without impacting the duration. Furthermore planners usually need to adjust the selection of resources in order to shorten or lengthen the project duration. Finding optimal decisions is difficult and time-consuming considering the numbers of permutations involved. For example, a critical-path-method network with only eight activities, each with two options, will have 256 (2(8)) alternatives. Exhaustive enumeration is not economically feasible even with very fast computers. This paper presents a new algorithm using linear and integer programming to efficiently obtain optimal resource selections that optimize time and cost of a construction project.
引用
收藏
页码:446 / 454
页数:9
相关论文
共 50 条
  • [31] Time-cost trade-off analysis of a priority based assignment problem
    Kaur, Prabhjot
    Dahiya, Kalpana
    Verma, Vanita
    OPSEARCH, 2021, 58 (02) : 448 - 482
  • [32] Time-cost Trade-off Analysis of Project Using Fuzzy-Genetic Approach
    Glisovic, Natasa
    ECONOMICS AND SOCIAL SCIENCE, 2013, 13 : 121 - 126
  • [33] Time-cost trade-off analysis of a priority based assignment problem
    Prabhjot Kaur
    Kalpana Dahiya
    Vanita Verma
    OPSEARCH, 2021, 58 : 448 - 482
  • [34] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [35] Using machine learning and GA to solve time-cost trade-off problems
    Li, Heng
    Cao, J.-N.
    Love, P.E.D.
    Journal of Construction Engineering and Management, 125 (05): : 347 - 353
  • [36] MANAGING NEW PRODUCT TIME TO MARKET USING TIME-COST TRADE-OFF METHODS
    HAFFNER, EW
    GRAVES, RJ
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1988, 16 (02): : 117 - 124
  • [37] Using machine learning and GA to solve time-cost trade-off problems
    Li, H
    Cao, JN
    Love, PED
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1999, 125 (05) : 347 - 353
  • [38] A time-cost trade-off model with resource consideration using genetic algorithm
    Chua, DKH
    Chan, WT
    Govindan, K
    CIVIL ENGINEERING SYSTEMS, 1997, 14 (04): : 291 - 311
  • [39] Network analysis algorithm for the solution of discrete time-cost trade-off problem
    Önder Halis Bettemir
    M. Talat Birgönül
    KSCE Journal of Civil Engineering, 2017, 21 : 1047 - 1058