NEW EXACT AND HEURISTIC ALGORITHMS FOR THE CREW SCHEDULING PROBLEM

被引:0
|
作者
BIANCO, L
MINGOZZI, A
RICCIARDELLI, S
SPADONI, M
机构
[1] CNR,IST ANAL SISTEMI & INFORMAT,I-00185 ROME,ITALY
[2] UNIV PESCARA,IST STAT,PESCARA,ITALY
[3] UNIV URBINO,FAC ECON & COMMERCIO,I-61029 URBINO,ITALY
[4] UNIV LAQUILA,DIPARTIMENTO MATEMAT,I-67100 LAQUILA,ITALY
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper the Crew Scheduling problem (CSP) is formulated as the problem of determining a set of disjoint paths covering all the vertices of an acyclic graph so as to satisfy the problem constraints and to minimize the sum of the path costs. We give a Set Partitioning formulation of the problem and we describe a procedure to compute a lower bound to the CSP that does not require the a priori generation of the entire Set Partitioning matrix. We formulate an exact dynamic program that makes use of bounding functions to eliminate redundant states. We discuss heuristic rules to be incorporated in the exact dynamic program that drastically reduce the size of the state space graph. However the resulting heuristic algorithms, under certain circumstances, can prove the optimality of the solution produced or provide an estimate of the distance from optimality that is' better than the distance between the initial lower bound and the optimal solution cost.
引用
收藏
页码:446 / 455
页数:10
相关论文
共 50 条
  • [31] Exact and heuristic algorithms for the weighted total domination problem
    Alvarez-Miranda, Eduardo
    Sinnl, Markus
    COMPUTERS & OPERATIONS RESEARCH, 2021, 127
  • [32] Exact and heuristic algorithms for the Indel Maximum Likelihood Problem
    Diallo, Abdoulaye Banire
    Makarenkov, Vladimir
    Blanchette, Mathieu
    JOURNAL OF COMPUTATIONAL BIOLOGY, 2007, 14 (04) : 446 - 461
  • [33] Heuristic and exact algorithms for the spanning tree detection problem
    Yamada, T
    Kataoka, S
    Watanabe, K
    COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (02) : 239 - 255
  • [34] A NEW MODEL AND HEURISTIC ALGORITHMS FOR THE MULTIPLE-DEPOT VEHICLE SCHEDULING PROBLEM
    Wang, Jin-Yuan
    Lin, Chih-Kang
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2010, 33 (02) : 287 - 299
  • [35] Heuristic Algorithms for a New and Practical Wire Rod and Bar Rolling Scheduling Problem
    Zhao, Yafeng
    Zhao, Xianming
    Liu, Shixin
    PROCEEDINGS OF THE 33RD CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2021), 2021, : 258 - 263
  • [36] The crew timetabling problem: An extension of the crew scheduling problem
    Marta Castilho Gomes
    Luís Cavique
    Isabel Themido
    Annals of Operations Research, 2006, 144 : 111 - 132
  • [37] The Crew Timetabling Problem: An extension of the Crew Scheduling Problem
    Castilho Gomes, Marta
    Cavique, Luis
    Themido, Isabel
    ANNALS OF OPERATIONS RESEARCH, 2006, 144 (01) : 111 - 132
  • [38] Heuristic algorithms for a complex parallel machine scheduling problem
    Blazsik, Zoltan
    Imreh, Csanad
    Kovacs, Zoltan
    CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2008, 16 (04) : 379 - 390
  • [39] Heuristic algorithms for the problem of task scheduling with moving executors
    Józefczyk, Jerzy
    Systems Science, 2004, 30 (03): : 95 - 103
  • [40] Heuristic algorithms for a complex parallel machine scheduling problem
    Zoltán Blázsik
    Csanád Imreh
    Zoltán Kovács
    Central European Journal of Operations Research, 2008, 16 : 379 - 390