共 50 条
- [42] Heuristic for a new multiobjective scheduling problem Optimization Letters, 2007, 1 : 213 - 225
- [47] Heuristic and Exact Algorithms for the Precedence-Constrained Knapsack Problem Journal of Optimization Theory and Applications, 2000, 105 : 659 - 676
- [49] The genetic algorithms application to the railway crew-scheduling problem in Taiwan TRAFFIC AND TRANSPORTATION STUDIES, VOLS 1 AND 2, PROCEEDINGS, 2002, : 1573 - 1580