The crew timetabling problem: An extension of the crew scheduling problem

被引:0
|
作者
Marta Castilho Gomes
Luís Cavique
Isabel Themido
机构
[1] Instituto Superior Técnico,CESUR
[2] Instituto Politécnico de Lisboa,ESCS
来源
关键词
Crew scheduling; Cover crews; Resource levelling; Multigraph; Tabu search;
D O I
暂无
中图分类号
学科分类号
摘要
In some urban transportation companies driving periods are short when compared with the total duty time, leading to long non-driving periods that can be used as cover time. This paper presents the Crew Timetabling Problem, an extension of the Crew Scheduling Problem in which crew timetables are obtained by levelling the cover crew resources. An objective function for this problem is proposed in order to balance the number of driving and cover crews. A Lisbon Underground case study is used to illustrate the Crew Timetabling Problem. The problem is represented in a multigraph and solved by a tabu search-based heuristic.
引用
收藏
页码:111 / 132
页数:21
相关论文
共 50 条
  • [1] The Crew Timetabling Problem: An extension of the Crew Scheduling Problem
    Castilho Gomes, Marta
    Cavique, Luis
    Themido, Isabel
    ANNALS OF OPERATIONS RESEARCH, 2006, 144 (01) : 111 - 132
  • [2] AN APPROACH TO THE CREW SCHEDULING PROBLEM
    EDWARDS, GR
    NEW ZEALAND OPERATIONAL RESEARCH, 1980, 8 (02): : 153 - 171
  • [3] RAILROAD CREW SCHEDULING PROBLEM
    DEMASCO, JM
    SNYDER, PW
    OPERATIONS RESEARCH, 1975, 23 : B323 - B323
  • [4] The operational airline crew scheduling problem
    Stojkovic, M
    Soumis, F
    Desrosiers, J
    TRANSPORTATION SCIENCE, 1998, 32 (03) : 232 - 245
  • [5] A set partitioning approach to the crew scheduling problem
    Mingozzi, A
    Boschetti, MA
    Ricciardelli, S
    Bianco, L
    OPERATIONS RESEARCH, 1999, 47 (06) : 873 - 888
  • [6] A GRASP algorithm for the bus crew scheduling problem
    Pena, David Pardo
    Martinez, David Alvarez
    Escobar, John Wilmer
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2024, 15 (02) : 443 - 456
  • [7] A tree search algorithm for the crew scheduling problem
    Beasley, JE
    Cao, B
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 94 (03) : 517 - 526
  • [8] An efficient estimation function for the crew scheduling problem
    Murillo, Javier
    Lopez, Beatriz
    ARTIFICIAL INTELLIGENCE RESEARCH AND DEVELOPMENT, 2007, 163 : 11 - 18
  • [9] A Fix & Relax matheuristic for the Crew Scheduling Problem
    Fuentes, Manuel
    Cadarso, Luis
    Marin, Angel
    XIII CONFERENCE ON TRANSPORT ENGINEERING, CIT2018, 2018, 33 : 307 - 314
  • [10] Modeling and solving for railway crew scheduling problem
    Wang, Fuzhang
    Wang, Haixing
    Shen, Jinsheng
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 8621 - +