SOLVING RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEMS BY A-STAR SEARCH

被引:0
|
作者
BELL, CE
PARK, K
机构
[1] Department of Management Sciences, University of Iowa, Iowa City, Iowa
关键词
D O I
10.1002/1520-6750(199002)37:1<61::AID-NAV3220370104>3.0.CO;2-S
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
A new exact method is presented for finding a minimum makespan schedule for a multiresource constrained project scheduling problem. This method employs the philosophical approach used earlier to develop a successful heuristic algorithm for the same class of problems. The approach repairs resource conflicts rather than constructing detailed schedules by dispatching activities. Resource‐violating sets of activities are identified whose concurrent execution would violate resource constraints. Repairs are made by imposing a precedence constraint to sequence two activities in such a resource‐violating set. Computational results are discussed for a standard set of test problems. An A* algorithm is employed. The most successful version of our algorithm involves some perhaps surprising design choices which might be relevant to the design of A*‐like search algorithms in other contexts. Copyright © 1990 Wiley Periodicals, Inc., A Wiley Company
引用
收藏
页码:61 / 84
页数:24
相关论文
共 50 条
  • [41] A Hybrid Differential Evolution with Cuckoo Search for Solving Resource Constrained Project Scheduling Problems
    Sallam, Karam M.
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 1344 - 1348
  • [42] PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem
    Robert Klein
    Armin Scholl
    Mathematical Methods of Operations Research, 2000, 52 : 467 - 488
  • [43] PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem
    Klein, R
    Scholl, A
    MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2000, 52 (03) : 467 - 488
  • [44] Modelling and Solving Multi-mode Resource-Constrained Project Scheduling
    Szeredi, Ria
    Schutt, Andreas
    PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING, CP 2016, 2016, 9892 : 483 - 492
  • [45] Solving Resource-Constrained Project Scheduling Problem Using Metaheuristic Algorithm
    Munlin, Mudarmeen
    2018 5TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONIC ENGINEERING (ICEEE), 2018, : 344 - 349
  • [46] Modeling and solving the resource-constrained project scheduling problem with activities overlapping
    Yu, Jing
    Xu, Zhe
    Li, Hong-Bo
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2015, 35 (05): : 1236 - 1245
  • [47] Team of A-Teams for Solving the Resource-Constrained Project Scheduling Problem
    Jedrzejowicz, Piotr
    Ratajczak-Ropel, Ewa
    ADVANCES IN KNOWLEDGE-BASED AND INTELLIGENT INFORMATION AND ENGINEERING SYSTEMS, 2012, 243 : 1201 - 1210
  • [48] Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm
    Liu, Jia
    Liu, Yisheng
    Shi, Ying
    Li, Jian
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2020, 34 (02)
  • [49] Optimization algorithms for solving resource-constrained project scheduling problem: A review
    Liu, Shi-Xin
    Wang, Meng-Guang
    Tang, Jia-Fu
    Kongzhi yu Juece/Control and Decision, 2001, 16 (SUPPL.): : 647 - 651
  • [50] Tabu search for resource-constrained scheduling
    Verhoeven, MGA
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 106 (2-3) : 266 - 276