SOLVING RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEMS BY A-STAR SEARCH

被引:0
|
作者
BELL, CE
PARK, K
机构
[1] Department of Management Sciences, University of Iowa, Iowa City, Iowa
关键词
D O I
10.1002/1520-6750(199002)37:1<61::AID-NAV3220370104>3.0.CO;2-S
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
A new exact method is presented for finding a minimum makespan schedule for a multiresource constrained project scheduling problem. This method employs the philosophical approach used earlier to develop a successful heuristic algorithm for the same class of problems. The approach repairs resource conflicts rather than constructing detailed schedules by dispatching activities. Resource‐violating sets of activities are identified whose concurrent execution would violate resource constraints. Repairs are made by imposing a precedence constraint to sequence two activities in such a resource‐violating set. Computational results are discussed for a standard set of test problems. An A* algorithm is employed. The most successful version of our algorithm involves some perhaps surprising design choices which might be relevant to the design of A*‐like search algorithms in other contexts. Copyright © 1990 Wiley Periodicals, Inc., A Wiley Company
引用
收藏
页码:61 / 84
页数:24
相关论文
共 50 条
  • [31] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,
  • [32] Adaptive multi-criteria search technique for resource-constrained project scheduling problems
    Ahsan, MK
    Tsao, DB
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2005, 12 (03): : 286 - 295
  • [33] A Local Search Algorithm for the Resource-Constrained Project Scheduling Problem
    Goncharov E.N.
    Journal of Applied and Industrial Mathematics, 2022, 16 (04) : 672 - 683
  • [34] Problem space search algorithms for resource-constrained project scheduling
    Naphade, KS
    Wu, SD
    Storer, RH
    ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) : 307 - 326
  • [35] Problem space search algorithms for resource-constrained project scheduling
    Kedar S. Naphade
    S. David Wu
    Robert H. Storer
    Annals of Operations Research, 1997, 70 : 307 - 326
  • [36] Solving resource-constrained construction scheduling problems with overlaps by metaheuristic
    Bozejko, Wojciech
    Hejducki, Zdzislaw
    Uchronski, Mariusz
    Wodecki, Mieczyslaw
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (05) : 649 - 659
  • [37] A survey in the resource-constrained project and multi-project scheduling problems
    Ben Issa, Samer
    Tu, Yiliu
    JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 117 - 138
  • [38] Handling Alternative Activities in Resource-Constrained Project Scheduling Problems
    Kuster, Juergen
    Jannach, Dietmar
    Friedrich, Gerhard
    20TH INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE, 2007, : 1960 - 1965
  • [39] Consolidated optimization algorithm for resource-constrained project scheduling problems
    Elsayed, Saber
    Sarker, Ruhul
    Ray, Tapabrata
    Coello Coello, Carlos
    INFORMATION SCIENCES, 2017, 418 : 346 - 362
  • [40] A New MBS Representation for Resource-Constrained Project Scheduling Problems
    Hao, Xingxing
    Liu, Jing
    2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 217 - 224