SOLVING RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEMS BY A-STAR SEARCH

被引:0
|
作者
BELL, CE
PARK, K
机构
[1] Department of Management Sciences, University of Iowa, Iowa City, Iowa
关键词
D O I
10.1002/1520-6750(199002)37:1<61::AID-NAV3220370104>3.0.CO;2-S
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
A new exact method is presented for finding a minimum makespan schedule for a multiresource constrained project scheduling problem. This method employs the philosophical approach used earlier to develop a successful heuristic algorithm for the same class of problems. The approach repairs resource conflicts rather than constructing detailed schedules by dispatching activities. Resource‐violating sets of activities are identified whose concurrent execution would violate resource constraints. Repairs are made by imposing a precedence constraint to sequence two activities in such a resource‐violating set. Computational results are discussed for a standard set of test problems. An A* algorithm is employed. The most successful version of our algorithm involves some perhaps surprising design choices which might be relevant to the design of A*‐like search algorithms in other contexts. Copyright © 1990 Wiley Periodicals, Inc., A Wiley Company
引用
收藏
页码:61 / 84
页数:24
相关论文
共 50 条
  • [21] Resource-constrained project scheduling:: Computing lower bounds by solving minimum cut problems
    Möhring, RH
    Schulz, AS
    Stork, F
    Uetz, M
    ALGORITHMS - ESA'99, 1999, 1643 : 139 - 150
  • [22] Differential evolution for solving multi-mode resource-constrained project scheduling problems
    Damak, N.
    Jarboui, B.
    Siarry, P.
    Loukil, T.
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (09) : 2653 - 2659
  • [23] New approaches for solving the resource-constrained project scheduling problem
    Kone, Oumar
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2013, 11 (01): : 93 - 94
  • [24] MULTI MODE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEMS WITH SOLVING TABOO SEARCH
    Atli, Omer
    Kahraman, Cengiz
    UNCERTAINTY MODELING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2012, 7 : 448 - 453
  • [25] A genetic algorithm for solving resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 185 - 193
  • [26] Solving resource-constrained project scheduling problem with evolutionary programming
    Sebt, M. H.
    Alipouri, Y.
    Alipouri, Y.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (09) : 1327 - 1335
  • [27] A genetic algorithm for solving fuzzy resource-constrained project scheduling
    Wang, H
    Lin, D
    Li, MQ
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 171 - 180
  • [28] New approaches for solving the resource-constrained project scheduling problem
    Oumar Koné
    4OR, 2013, 11 : 93 - 94
  • [29] New approaches for solving the resource-constrained project scheduling problem
    Kone, Oumar
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2012, 10 (01): : 105 - 106
  • [30] New approaches for solving the resource-constrained project scheduling problem
    Oumar Koné
    4OR, 2012, 10 : 105 - 106