The calculation of acceleration costs on construction projects

被引:0
|
作者
Maritz, Tinus [1 ]
Schutte, Andries [2 ]
机构
[1] Univ Pretoria, Dept Construct Econ, ZA-0002 Pretoria, South Africa
[2] Ivanhoe Mines Mongolia Inc, Ulaanbaatar, Mongolia
关键词
Construction; delays; acceleration; claims; float; critical path;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A lack of understanding often exists between contractors, client organisations and consultants as to what may, and what may not, be included in acceleration claims on construction projects. The aim of this article is to create a better understanding of the complexity of acceleration claims. It should also lead to new insights into claim procedures and the substantiation of acceleration costs. The impacts and delays which may result in acceleration claims on a project were analysed as they form the basis for establishing liability in terms of a particular contract. Matters of principle that are applicable to acceleration claims, regardless of the form of contract recommended for use in the South African construction industry, were also examined. The findings indicate that there are significant differences on a number of aspects regarding the calculation of acceleration costs on construction projects between contractors, consultants and employers/developers. The majority of the respondents, however, were of the opinion that of the various methods used for calculating acceleration costs, the time impact analysis is most frequently applied, but that the modified total cost approach is the method most suitable on projects where there is a significant increase in the scope of work, something that occurs regularly on construction projects.
引用
收藏
页码:86 / 102
页数:17
相关论文
共 50 条
  • [21] Systematization of costs and effects as a method of costs management in innovative projects of underground construction
    Papelniuk, Oksana
    15TH INTERNATIONAL SCIENTIFIC CONFERENCE UNDERGROUND URBANISATION AS A PREREQUISITE FOR SUSTAINABLE DEVELOPMENT, 2016, 165 : 1310 - 1316
  • [22] How to Use Lean Construction to Control the Implicit Quality Costs in Construction Projects
    Shao, Bilin
    Chen, Zhuo
    Wang, Fan
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 3102 - 3105
  • [23] Proposal of a model for the quantification of construction waste costs in the planning stage of construction projects
    Garces, Gonzalo
    Molina, Antonio
    INFORMES DE LA CONSTRUCCION, 2023, 75 (751)
  • [24] Factors Influencing Transaction Costs in Construction Projects: A Critical Review
    Jin, Xiao-Hua
    Zhang, Guomin
    Ke, Yongjian
    Xia, Bo
    PROCEEDINGS OF THE 20TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2017, : 949 - 958
  • [25] Disturbed construction process - Determination of extra construction time and calculation of the additional costs of construction
    Boetzkes, Frank A.
    BAUTECHNIK, 2010, 87 (03) : 145 - 157
  • [26] Determining the probability distribution of rework costs in construction and engineering projects
    Love, Peter E. D.
    Sing, Chun-Pong
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2013, 9 (11) : 1136 - 1148
  • [27] A method to estimate occupational health and safety costs in construction projects
    Eugenio Pellicer
    Gloria I. Carvajal
    M. Carmen Rubio
    Joaquín Catalá
    KSCE Journal of Civil Engineering, 2014, 18 : 1955 - 1965
  • [28] Identifying Contractors' Planned Quality Costs in Indonesian Construction Projects
    Marzuki, Puti F.
    Wisridani, M.
    JOURNAL OF ENGINEERING AND TECHNOLOGICAL SCIENCES, 2014, 46 (04): : 368 - 380
  • [29] Quantitative Analysis of the Accident Prevention Costs in Korean Construction Projects
    Lee, Jaehyun
    Jeong, Jaewook
    Soh, Jayho
    Jeong, Jaemin
    BUILDINGS, 2022, 12 (10)
  • [30] A study on construction costs per unit area of irrigation projects
    Koç C.
    Irrigation and Drainage Systems, 2011, 25 (04) : 255 - 263