The calculation of acceleration costs on construction projects

被引:0
|
作者
Maritz, Tinus [1 ]
Schutte, Andries [2 ]
机构
[1] Univ Pretoria, Dept Construct Econ, ZA-0002 Pretoria, South Africa
[2] Ivanhoe Mines Mongolia Inc, Ulaanbaatar, Mongolia
关键词
Construction; delays; acceleration; claims; float; critical path;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A lack of understanding often exists between contractors, client organisations and consultants as to what may, and what may not, be included in acceleration claims on construction projects. The aim of this article is to create a better understanding of the complexity of acceleration claims. It should also lead to new insights into claim procedures and the substantiation of acceleration costs. The impacts and delays which may result in acceleration claims on a project were analysed as they form the basis for establishing liability in terms of a particular contract. Matters of principle that are applicable to acceleration claims, regardless of the form of contract recommended for use in the South African construction industry, were also examined. The findings indicate that there are significant differences on a number of aspects regarding the calculation of acceleration costs on construction projects between contractors, consultants and employers/developers. The majority of the respondents, however, were of the opinion that of the various methods used for calculating acceleration costs, the time impact analysis is most frequently applied, but that the modified total cost approach is the method most suitable on projects where there is a significant increase in the scope of work, something that occurs regularly on construction projects.
引用
收藏
页码:86 / 102
页数:17
相关论文
共 50 条
  • [1] Stochastic calculation of risk costs in construction projects during cost estimation
    Cadez, Ivan
    Brokbals, Stefanie
    Wapelhorst, Vincent
    BAUTECHNIK, 2019, 96 (04) : 319 - 328
  • [2] Transparency of Costs in Construction Projects
    不详
    BAUINGENIEUR, 2014, 89 : A30 - A30
  • [3] Calculation of risk costs in construction projects: Empirical analysis of construction risks applying the Monte Carlo method
    Brokbals, Stefanie
    Wapelhorst, Vincent
    Čadež, Ivan
    Civil Engineering Design, 2019, 1 (3-4) : 120 - 128
  • [4] Optimized acceleration of repetitive construction projects
    Bakry, Ibrahim
    Moselhi, Osama
    Zayed, Tarek
    AUTOMATION IN CONSTRUCTION, 2014, 39 : 145 - 151
  • [5] Calculation of contingency in construction projects
    Touran, A
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2003, 50 (02) : 135 - 140
  • [6] Calculation of the risk costs in construction projects - actualization of Schubert's study from 1971
    Brokbals, Stefanie
    Wapelhorst, Vincent
    Cadez, Ivan
    BAUTECHNIK, 2019, 96 (04) : 299 - 312
  • [7] Assessment of transaction costs for construction projects
    Abdel-Galil, Emad
    Ibrahim, Ahmed H.
    Alborkan, Ahmed
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (09) : 1618 - 1631
  • [8] Determinants of transaction costs in construction projects
    Li, Huimin
    Arditi, David
    Wang, Zhuofu
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (05) : 548 - 558
  • [9] Design Error Costs in Construction Projects
    Lopez, Robert
    Love, Peter E. D.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (05) : 585 - 593
  • [10] Investigating the overhead costs in construction projects in Palestine
    Enshassi, Adnan
    Aziz, Abdul
    El Karriri, Ala'a
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2008, 13 (01) : 35 - +