Fast combination of scheduling chains under resource and time constraints

被引:0
|
作者
Ji-min Wang
Xue-zeng Pan
Jie-bing Wang
Kang Sun
机构
[1] Zhejiang University,School of Computer Science and Technology
关键词
Fast combination algorithm; Chain-based scheduling algorithm; High-level synthesis (HLS); Minimum length prediction; TP391.7;
D O I
暂无
中图分类号
学科分类号
摘要
Scheduling chain combination is the core of chain-based scheduling algorithms, the speed of which determines the overall performance of corresponding scheduling algorithm. However, backtracking is used in general combination algorithms to traverse the whole search space which may introduce redundant operations, so performance of the combination algorithm is generally poor. A fast scheduling chain combination algorithm which avoids redundant operations by skipping “incompatible” steps of scheduling chains and using a stack to remember the scheduling state is presented in this paper to overcome the problem. Experimental results showed that it can improve the performance of scheduling algorithms by up to 15 times. By further omitting unnecessary operations, a fast algorithm of minimum combination length prediction is developed, which can improve the speed by up to 10 times.
引用
收藏
页码:119 / 126
页数:7
相关论文
共 50 条
  • [21] An architecture for workflow scheduling under resource allocation constraints
    Senkul, P
    Toroslu, IH
    INFORMATION SYSTEMS, 2005, 30 (05) : 399 - 422
  • [22] Scheduling Optimization of Prefabricated Buildings under Resource Constraints
    He, Wei
    Li, Wenjing
    Meng, Xiaofeng
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (12) : 4507 - 4519
  • [23] Dynamic transport scheduling under multiple resource constraints
    Ebben, MJR
    van der Heijden, MC
    van Harten, A
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (02) : 320 - 335
  • [24] On the project scheduling problem under stored resource constraints
    Gimadi, EK
    Sevastianov, SV
    Zalyubovsky, VV
    ETFA 2001: 8TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2001, : 703 - 705
  • [25] Scheduling for low power under resource and latency constraints
    Katkoori, S
    Vemuri, R
    ISCAS 2000: IEEE INTERNATIONAL SYMPOSIUM ON CIRCUITS AND SYSTEMS - PROCEEDINGS, VOL II: EMERGING TECHNOLOGIES FOR THE 21ST CENTURY, 2000, : 53 - 56
  • [26] Critical path scheduling under resource calendar constraints
    Lu, Ming
    Lam, Hoi-Ching
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (01) : 25 - 31
  • [27] Project scheduling with time-varying resource constraints
    Klein, R
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (16) : 3937 - 3952
  • [28] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS
    Benjaoran, Vacharapoom
    Sae-Tae, Numpheungk
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39
  • [29] Scheduling under resource constraints using dis-equations
    Cherroun, Hadda
    Darte, Alain
    Feautrier, Paul
    2006 DESIGN AUTOMATION AND TEST IN EUROPE, VOLS 1-3, PROCEEDINGS, 2006, : 1066 - +
  • [30] Elective Patient Admission and Scheduling under Multiple Resource Constraints
    Barz, Christiane
    Rajaram, Kumar
    PRODUCTION AND OPERATIONS MANAGEMENT, 2015, 24 (12) : 1907 - 1930