Scheduling for low power under resource and latency constraints

被引:0
|
作者
Katkoori, S [1 ]
Vemuri, R [1 ]
机构
[1] Univ S Florida, CS&E Dept, Tampa, FL 33620 USA
关键词
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
We extend the Force-Directed List Scheduling (FDLS) algorithm proposed by Paulin and Knight [1]. In any time step, if the number of ready operations exceeds the available functional resources, then some operations must be deferred.. The concept of "force" introduced in [1] captures the effect of deferring an operation on the schedule length: larger the force, lower the likelihood of schedule length increase due to the operation's deferral. We develop a power cost function that captures the effect of an operation's deferral on the total power consumption of the design. The novelty of the work lies in heuristically determining the "best" time-step for an operation such that the overall power consumption is minimized without sacrificing the design throughput. The power-delay cost function proposed at the operation-level facilitates such an exploration. Experimental results show power savings of up to 60% with an average power savings of 23% at datapath level, 3% at the controller level, and 14% at the design-level.
引用
收藏
页码:53 / 56
页数:4
相关论文
共 50 条
  • [1] A Low Power Scheduling methodology under Timing and Resource Constraints
    Wang Wei-Bin
    PROCEEDINGS OF THE 14TH YOUTH CONFERENCE ON COMMUNICATION, 2009, : 380 - 382
  • [2] Resource scheduling and provisioning for processing of dynamic stream workflows under latency constraints
    Brown, Alexander
    Garg, Saurabh
    Montgomery, James
    KC, Ujjwal
    Future Generation Computer Systems, 2022, 131 : 166 - 182
  • [3] Resource scheduling and provisioning for processing of dynamic stream workflows under latency constraints
    Brown, Alexander
    Garg, Saurabh
    Montgomery, James
    Ujjwal, K. C.
    FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2022, 131 : 166 - 182
  • [4] ON THE PROJECT SCHEDULING UNDER RESOURCE CONSTRAINTS
    Shih, Neng-Hui
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2006, 23 (06) : 494 - 500
  • [5] Scheduling under labour resource constraints
    Heipcke S.
    Colombani Y.
    Cavalcante C.C.B.
    De Souza C.C.
    Constraints, 2000, 5 (4) : 415 - 422
  • [6] On the minimum latency transmission scheduling in wireless networks with power control under SINR constraints
    Charalambous, T.
    Klerides, E.
    Wiesemann, W.
    Vassiliou, A.
    Hadjitheophanous, S.
    Deliparaschos, K. M.
    TRANSACTIONS ON EMERGING TELECOMMUNICATIONS TECHNOLOGIES, 2015, 26 (03): : 367 - 379
  • [7] SCHEDULING UNDER RESOURCE CONSTRAINTS AND MODULE ASSIGNMENT
    BERGAMASCHI, RA
    CAMPOSANO, R
    PAYER, M
    INTEGRATION-THE VLSI JOURNAL, 1991, 12 (01) : 1 - 19
  • [8] PREEMPTIVE SCHEDULING UNDER TIME AND RESOURCE CONSTRAINTS
    ZHAO, W
    RAMAMRITHAM, K
    STANKOVIC, JA
    IEEE TRANSACTIONS ON COMPUTERS, 1987, 36 (08) : 949 - 960
  • [9] Complexity of Scheduling Under Resource Constraints.
    Blazewicz, J.
    Weglarz, J.
    Archiwum Automatyki i Telemechaniki, 1984, 29 (1-2): : 3 - 33
  • [10] Scheduling with multiple voltages under resource constraints
    Sarrafzadeh, M
    Raje, S
    ISCAS '99: PROCEEDINGS OF THE 1999 IEEE INTERNATIONAL SYMPOSIUM ON CIRCUITS AND SYSTEMS, VOL 1: VLSI, 1999, : 350 - 353