Scheduling for low power under resource and latency constraints

被引:0
|
作者
Katkoori, S [1 ]
Vemuri, R [1 ]
机构
[1] Univ S Florida, CS&E Dept, Tampa, FL 33620 USA
关键词
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
We extend the Force-Directed List Scheduling (FDLS) algorithm proposed by Paulin and Knight [1]. In any time step, if the number of ready operations exceeds the available functional resources, then some operations must be deferred.. The concept of "force" introduced in [1] captures the effect of deferring an operation on the schedule length: larger the force, lower the likelihood of schedule length increase due to the operation's deferral. We develop a power cost function that captures the effect of an operation's deferral on the total power consumption of the design. The novelty of the work lies in heuristically determining the "best" time-step for an operation such that the overall power consumption is minimized without sacrificing the design throughput. The power-delay cost function proposed at the operation-level facilitates such an exploration. Experimental results show power savings of up to 60% with an average power savings of 23% at datapath level, 3% at the controller level, and 14% at the design-level.
引用
收藏
页码:53 / 56
页数:4
相关论文
共 50 条
  • [41] An FPTAS for scheduling with resource constraints
    Chen, Bo
    Strusevich, Vitaly A.
    OPERATIONS RESEARCH LETTERS, 2023, 51 (04) : 421 - 424
  • [42] 5G Ultra-Reliable and Low Latency Communication Resource Scheduling for Power Business Quality Assurance
    Feng Lei
    Xie Kunyi
    Zhu Liang
    Qiu Xuesong
    Guo Shaoyong
    JOURNAL OF ELECTRONICS & INFORMATION TECHNOLOGY, 2021, 43 (12) : 3418 - 3426
  • [43] JOB SHOP SCHEDULING UNDER RESOURCE CONSTRAINTS AND VARYING ORDER PRIORITIES
    WORRALL, BM
    COMPUTERS & INDUSTRIAL ENGINEERING, 1986, 11 (1-4) : 199 - 203
  • [44] Fuzzy Activity Network Method for Project Scheduling Under Resource Constraints
    Luong Duc Long
    Ohsato, Ario
    JOURNAL OF ADVANCED COMPUTATIONAL INTELLIGENCE AND INTELLIGENT INFORMATICS, 2007, 11 (08) : 914 - 921
  • [45] Project Scheduling Under Resource Constraints: Application of the Cumulative Global Constraint
    Trojet, Mariem
    H'Mida, Fehmi
    Lopez, Pierre
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 62 - +
  • [46] An improved algorithm for parallel machine scheduling under additional resource constraints
    Zhang, An
    Zhen, Tan
    Chen, Yong
    Chen, Guangting
    OPTIMIZATION LETTERS, 2023, 17 (03) : 753 - 769
  • [47] Scheduling problems for parallel dedicated machines under multiple resource constraints
    Kellerer, H
    Strusevich, VA
    DISCRETE APPLIED MATHEMATICS, 2003, 133 (1-3) : 45 - 68
  • [48] An Optimization Approach for Surgery Scheduling under Multi-Resource Constraints
    Yin, Jiao
    Xiang, Wei
    Chen, Saifeng
    ADVANCES IN ENGINEERING DESIGN AND OPTIMIZATION III, PTS 1 AND 2, 2012, 201-202 : 943 - +
  • [49] An Artificial Immune Algorithm for the project scheduling problem under resource constraints
    Mobini, Mahdi
    Mobini, Zahra
    Rabbani, Masoud
    APPLIED SOFT COMPUTING, 2011, 11 (02) : 1975 - 1982
  • [50] Heuristic and metaheuristic approaches for parallel machine scheduling under resource constraints
    Mohamed Amine Abdeljaoued
    Nour El Houda Saadani
    Zied Bahroun
    Operational Research, 2020, 20 : 2109 - 2132