Fast combination of scheduling chains under resource and time constraints

被引:0
|
作者
Ji-min Wang
Xue-zeng Pan
Jie-bing Wang
Kang Sun
机构
[1] Zhejiang University,School of Computer Science and Technology
关键词
Fast combination algorithm; Chain-based scheduling algorithm; High-level synthesis (HLS); Minimum length prediction; TP391.7;
D O I
暂无
中图分类号
学科分类号
摘要
Scheduling chain combination is the core of chain-based scheduling algorithms, the speed of which determines the overall performance of corresponding scheduling algorithm. However, backtracking is used in general combination algorithms to traverse the whole search space which may introduce redundant operations, so performance of the combination algorithm is generally poor. A fast scheduling chain combination algorithm which avoids redundant operations by skipping “incompatible” steps of scheduling chains and using a stack to remember the scheduling state is presented in this paper to overcome the problem. Experimental results showed that it can improve the performance of scheduling algorithms by up to 15 times. By further omitting unnecessary operations, a fast algorithm of minimum combination length prediction is developed, which can improve the speed by up to 10 times.
引用
收藏
页码:119 / 126
页数:7
相关论文
共 50 条
  • [31] A Low Power Scheduling methodology under Timing and Resource Constraints
    Wang Wei-Bin
    PROCEEDINGS OF THE 14TH YOUTH CONFERENCE ON COMMUNICATION, 2009, : 380 - 382
  • [32] Utility accrual scheduling under joint utility and resource constraints
    Wu, HS
    Ravindran, N
    Jensen, ED
    SEVENTH IEEE INTERNATIONAL SYMPOSIUM ON OBJECT-ORIENTED REAL-TIME DISTRIBUTED COMPUTING, PROCEEDINGS, 2004, : 307 - 314
  • [33] ALGORITHM FOR OPTIMAL PROJECT SCHEDULING UNDER MULTIPLE RESOURCE CONSTRAINTS
    DAVIS, EW
    HEIDORN, GE
    MANAGEMENT SCIENCE SERIES B-APPLICATION, 1971, 17 (12): : B803 - B816
  • [34] Scheduling Construction Projects Under Fuzzy Modelling of Resource Constraints
    Kulejewski, Janusz
    Ibadov, Nabi
    Krzeminski, Michal
    XXVII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (27RSP) (TFOCE 2018), 2018, 196
  • [35] Fast real-time job selection with resource constraints under earliest deadline first
    Han, S
    Park, M
    Cho, Y
    EMBEDDED COMPUTER SYSTEMS: ARCHITECTURES, MODELING, AND SIMULATION, 2005, 3553 : 242 - 250
  • [36] Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
    Moon, C
    Kim, JS
    Gen, M
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (15) : 2941 - 2954
  • [37] A reinforcement learning method for scheduling service function chains with multi-resource constraints
    He, Rui
    Ren, Bangbang
    Xie, Junjie
    Guo, Deke
    Zhou, Yuwen
    Zhao, Laiping
    Li, Yong
    COMPUTER NETWORKS, 2023, 235
  • [38] PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS
    DIKE, SH
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1964, 11 (04) : 155 - 157
  • [39] An FPTAS for scheduling with resource constraints
    Chen, Bo
    Strusevich, Vitaly A.
    OPERATIONS RESEARCH LETTERS, 2023, 51 (04) : 421 - 424
  • [40] Prioritizing and Scheduling Service Requests under Time Constraints
    Dargahi, Farnaz
    Bhuiyan, Mohammad F. H.
    Wang, Chun
    Ding, Chen
    2014 IEEE INTERNATIONAL CONFERENCE ON SERVICES COMPUTING (SCC 2014), 2014, : 1 - 8