A genetic algorithm for the robust resource leveling problem

被引:0
|
作者
Hongbo Li
Erik Demeulemeester
机构
[1] Shanghai University,School of Management
[2] KU Leuven,Research Center for Operations Management, Faculty of Business and Economics
[3] Beihang University,School of Economics and Management
来源
Journal of Scheduling | 2016年 / 19卷
关键词
Project scheduling; Robust resource leveling; Stochastic activity durations; Genetic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
The resource leveling problem (RLP) involves the determination of a project baseline schedule that specifies the planned activity starting times while satisfying both the precedence constraints and the project deadline constraint under the objective of minimizing the variation in the resource utilization. However, uncertainty is inevitable during project execution. The baseline schedule generated by the deterministic RLP model tends to fail to achieve the desired objective when durations are uncertain. We study the robust resource leveling problem in which the activity durations are stochastic and the objective is to obtain a robust baseline schedule that minimizes the expected positive deviation of both resource utilizations and activity starting times. We present a genetic algorithm for the robust RLP. In order to demonstrate the effectiveness of our genetic algorithm, we conduct extensive computational experiments on a large number of randomly generated test instances and investigate the impact of different factors (the marginal cost of resource usage deviations, the marginal cost of activity starting time deviations, the activity duration variability, the due date, the order strength, the resource factor and the resource constrainedness).
引用
收藏
页码:43 / 60
页数:17
相关论文
共 50 条
  • [1] A genetic algorithm for the robust resource leveling problem
    Li, Hongbo
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2016, 19 (01) : 43 - 60
  • [2] A hybrid genetic algorithm for resource leveling problem
    Zhao, Hanping
    Liu, Liming
    Jiang, Jiadong
    Li, Ke
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON RISK ANALYSIS AND CRISIS RESPONSE, 2007, 2 : 786 - 790
  • [3] Genetic algorithm for resource leveling problem in project scheduling
    Liu, S.X.
    Wang, M.G.
    2001, Systems Engineering Society of China (21):
  • [4] Impact of Genetic Algorithm Operators in Solving Resource-Leveling Problem
    Krishnan, R. S. Gokula
    Selvam, Gopinath
    ADVANCES IN CONSTRUCTION MANAGEMENT, ACMM 2021, 2022, 191 : 343 - 354
  • [5] The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm
    Luis Ponz-Tienda, Jose
    Yepes, Victor
    Pellicer, Eugenio
    Moreno-Flores, Joaquin
    AUTOMATION IN CONSTRUCTION, 2013, 29 : 161 - 172
  • [6] Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling
    Selvam, Gopinath
    Tadepalli, T. Ch. Madhavi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (04) : 659 - 668
  • [7] A Memetic Algorithm for the Solution of the Resource Leveling Problem
    Iranagh, Mehdi
    Sonmez, Rifat
    Atan, Tankut
    Uysal, Furkan
    Bettemir, Onder Halis
    BUILDINGS, 2023, 13 (11)
  • [8] Heuristic algorithm for resource leveling problem in emergency scheduling
    Liang, Yan
    Jin, Ye
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2009, 15 (06): : 1165 - 1171
  • [9] Uncertain resource leveling problem
    Ke, Hua
    Zhao, Chenkai
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2017, 33 (04) : 2351 - 2361
  • [10] A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags
    Ponz-Tienda, J. L.
    Salcedo-Bernal, A.
    Pellicer, Eugenio
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2017, 32 (06) : 474 - 498