A genetic algorithm for the robust resource leveling problem

被引:0
|
作者
Hongbo Li
Erik Demeulemeester
机构
[1] Shanghai University,School of Management
[2] KU Leuven,Research Center for Operations Management, Faculty of Business and Economics
[3] Beihang University,School of Economics and Management
来源
Journal of Scheduling | 2016年 / 19卷
关键词
Project scheduling; Robust resource leveling; Stochastic activity durations; Genetic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
The resource leveling problem (RLP) involves the determination of a project baseline schedule that specifies the planned activity starting times while satisfying both the precedence constraints and the project deadline constraint under the objective of minimizing the variation in the resource utilization. However, uncertainty is inevitable during project execution. The baseline schedule generated by the deterministic RLP model tends to fail to achieve the desired objective when durations are uncertain. We study the robust resource leveling problem in which the activity durations are stochastic and the objective is to obtain a robust baseline schedule that minimizes the expected positive deviation of both resource utilizations and activity starting times. We present a genetic algorithm for the robust RLP. In order to demonstrate the effectiveness of our genetic algorithm, we conduct extensive computational experiments on a large number of randomly generated test instances and investigate the impact of different factors (the marginal cost of resource usage deviations, the marginal cost of activity starting time deviations, the activity duration variability, the due date, the order strength, the resource factor and the resource constrainedness).
引用
收藏
页码:43 / 60
页数:17
相关论文
共 50 条
  • [21] Combination of genetic & ant colony algorithms for multi-project resource leveling problem
    Li, Jing-Hua
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (03): : 643 - 649
  • [22] Application of CBO and CSS for Resource Allocation and Resource Leveling Problem
    M. Khanzadi
    A. Kaveh
    M. Alipour
    H. Karimi Aghmiuni
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2016, 40 : 1 - 10
  • [23] RESEARCH ON RESOURCE LEVELING PROBLEM UNDER RESOURCE CONSTRAINED CONDITION
    Wang, Qiang
    Qi, Jian-Xun
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-6, 2009, : 901 - 906
  • [24] Application of CBO and CSS for Resource Allocation and Resource Leveling Problem
    Khanzadi, M.
    Kaveh, A.
    Alipour, M.
    Aghmiuni, H. Karimi
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2016, 40 (01) : 1 - 10
  • [25] A Novel Resource-Leveling Approach for Prefabricated Construction Project Based on Genetic Algorithm
    Yu, Miao
    Wang, Yang
    Xu, Xiaoqing
    2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 1645 - 1650
  • [26] Scheduling Policies for the Stochastic Resource Leveling Problem
    Li, Hongbo
    Xu, Zhe
    Demeulemeester, Erik
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (02)
  • [27] The novel genetic algorithm to the grid resource assignment problem
    Zou, Guo-Ping, 1600, Editura Politechnica (12):
  • [28] The novel genetic algorithm to the grid resource assignment problem
    Zou, Guo-Ping
    BioTechnology: An Indian Journal, 2014, 10 (12) : 6756 - 6763
  • [29] Ant colony algorithm for construction resource leveling
    Kuang, Ya-Ping
    Xiong, Ying
    Zhang, Meng-Fang
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2008, 42 (07): : 1194 - 1198
  • [30] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976