A genetic algorithm for the robust resource leveling problem

被引:0
|
作者
Hongbo Li
Erik Demeulemeester
机构
[1] Shanghai University,School of Management
[2] KU Leuven,Research Center for Operations Management, Faculty of Business and Economics
[3] Beihang University,School of Economics and Management
来源
Journal of Scheduling | 2016年 / 19卷
关键词
Project scheduling; Robust resource leveling; Stochastic activity durations; Genetic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
The resource leveling problem (RLP) involves the determination of a project baseline schedule that specifies the planned activity starting times while satisfying both the precedence constraints and the project deadline constraint under the objective of minimizing the variation in the resource utilization. However, uncertainty is inevitable during project execution. The baseline schedule generated by the deterministic RLP model tends to fail to achieve the desired objective when durations are uncertain. We study the robust resource leveling problem in which the activity durations are stochastic and the objective is to obtain a robust baseline schedule that minimizes the expected positive deviation of both resource utilizations and activity starting times. We present a genetic algorithm for the robust RLP. In order to demonstrate the effectiveness of our genetic algorithm, we conduct extensive computational experiments on a large number of randomly generated test instances and investigate the impact of different factors (the marginal cost of resource usage deviations, the marginal cost of activity starting time deviations, the activity duration variability, the due date, the order strength, the resource factor and the resource constrainedness).
引用
收藏
页码:43 / 60
页数:17
相关论文
共 50 条
  • [41] A new hybrid genetic algorithm for the robust graph coloring problem
    Kong, Y
    Wang, F
    Lim, A
    Guo, SS
    AI 2003: ADVANCES IN ARTIFICIAL INTELLIGENCE, 2003, 2903 : 125 - 136
  • [42] A new hybrid genetic algorithm for the robust graph coloring problem
    Kong, Ying
    Wang, Fan
    Lim, Andrew
    Guo, Songshan
    Lecture Notes in Artificial Intelligence (Subseries of Lecture Notes in Computer Science), 2003, 2903 : 125 - 136
  • [43] Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
    Leu, SS
    Yang, CH
    Huang, JC
    AUTOMATION IN CONSTRUCTION, 2000, 10 (01) : 27 - 41
  • [44] GA applied in project resource allocation and leveling scheduling problem
    Luo, SP
    Tang, XZ
    Lin, LF
    Progress in Intelligence Computation & Applications, 2005, : 703 - 708
  • [45] Hybrid nature-inspired intelligence for the resource leveling problem
    Kyriklidis, Christos
    Vassiliadis, Vassilios
    Kirytopoulos, Konstantinos
    Dounias, Georgios
    OPERATIONAL RESEARCH, 2014, 14 (03) : 387 - 407
  • [46] Hybrid nature-inspired intelligence for the resource leveling problem
    Christos Kyriklidis
    Vassilios Vassiliadis
    Konstantinos Kirytopoulos
    Georgios Dounias
    Operational Research, 2014, 14 : 387 - 407
  • [47] The multi resource leveling and materials procurement problem: an integrated approach
    Almatroushi, Hessa
    Hariga, Moncer
    As'ad, Rami
    Al-Bar, AbdulRahman
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (09) : 2135 - 2161
  • [48] Hopfield-based solution for resource-leveling problem
    College of Information Science, South China Agriculture University, Guangzhou 510640, China
    Xitong Gongcheng Lilum yu Shijian, 2006, 3 (83-87):
  • [49] Metric estimation approach for managing uncertainty in resource leveling problem
    Tarasov, Ilia
    Hait, Alain
    Lazarev, Alexander
    Battaia, Olga
    ANNALS OF OPERATIONS RESEARCH, 2024, 337 (01) : 343 - 395
  • [50] A genetic algorithm for mode identity and the resource constrained project scheduling problem
    Afshar-Nadjafi, Behrouz
    Rahimi, Amir
    Karimi, Hamid
    SCIENTIA IRANICA, 2013, 20 (03) : 824 - 831