Genetic algorithm for resource leveling problem in project scheduling

被引:0
|
作者
Liu, S.X.
Wang, M.G.
机构
来源
| 2001年 / Systems Engineering Society of China卷 / 21期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling
    Selvam, Gopinath
    Tadepalli, T. Ch. Madhavi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (04) : 659 - 668
  • [2] A Genetic Hyperheuristic Algorithm for the Resource Constrained Project Scheduling Problem
    Anagnostopoulos, Konstantinos P.
    Koulinas, Georgios K.
    2010 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2010,
  • [3] Genetic Algorithm for Solving the Resource Constrained Project Scheduling Problem
    Alaa, Touihri
    Saoussen, Krichen
    Adel, Guitouni
    INTERNATIONAL JOURNAL OF APPLIED METAHEURISTIC COMPUTING, 2015, 6 (02) : 45 - 60
  • [4] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [5] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [6] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [7] A hybrid genetic algorithm for resource leveling problem
    Zhao, Hanping
    Liu, Liming
    Jiang, Jiadong
    Li, Ke
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON RISK ANALYSIS AND CRISIS RESPONSE, 2007, 2 : 786 - 790
  • [8] A genetic algorithm for the robust resource leveling problem
    Hongbo Li
    Erik Demeulemeester
    Journal of Scheduling, 2016, 19 : 43 - 60
  • [9] Heuristic algorithm for resource leveling problem in emergency scheduling
    Liang, Yan
    Jin, Ye
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2009, 15 (06): : 1165 - 1171
  • [10] A genetic algorithm for the robust resource leveling problem
    Li, Hongbo
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2016, 19 (01) : 43 - 60