共 50 条
- [31] Ant colony optimization algorithm for resource leveling problem of construction project PROCEEDINGS OF CRIOCM 2006 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2006, : 384 - 391
- [32] A resource constrained project scheduling problem with discounted cash flows: A genetic algorithm approach PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 632 - 638
- [33] Development of hybrid genetic algorithm for the resource constrained multi-project scheduling problem PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2005, VOL 3, PTS A AND B, 2005, : 1075 - 1082
- [35] A Genetic-Local Search Algorithm Approach for Resource Constrained Project Scheduling Problem 1ST INTERNATIONAL CONFERENCE ON COMPUTING COMMUNICATION CONTROL AND AUTOMATION ICCUBEA 2015, 2015, : 841 - 846
- [36] An Immune Genetic Algorithm for Resource Constrained Project Scheduling Problem with Discounted Cash Flows 2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 1179 - 1183
- [38] Genetic Algorithms for the Resource Constrained Project Scheduling Problem 13TH IEEE INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND INFORMATICS (CINTI 2012), 2012, : 39 - 47
- [39] Leveling of resources in staff scheduling problem based on hybrid genetic algorithm PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 473 - 479