Factors influencing Time and Cost Overruns on Freeform Construction Projects

被引:0
|
作者
Andrew Kavuma
Jongho Ock
Hyounseung Jang
机构
[1] Seoul National University of Science and Technology,School of Architecture
来源
关键词
time overruns; cost overruns; freeform projects; Building Information Modeling (BIM); latent factors;
D O I
暂无
中图分类号
学科分类号
摘要
Freeform buildings differ from conventional buildings in a way that they have irregularly shaped facades. Oftentimes, freeform projects run behind schedule and over the budget. This study aimed at exploring factors that influence time and cost overruns on freeform buildings. The study employed questionnaire surveys to collect data from experts with freeform project experience, and the responses were analyzed using R statistical program. The study used exploratory factor analysis to identify the most critical latent factors to freeform project success. The study found factors related to application of Building Information Modeling (BIM) and fabrication of freeform components as very crucial to timely completion, whereas factors related to personnel involved as essential to completing within budget. Additionally, the study summarized time overrun variables into three latent factors; uniqueness, capabilities and practices of the parties involved, and level of preparation for the project. The cost overrun latent factors were: cost uncertainty, client decisions, extent of preparation, and delay. Understanding the causes of time and cost overruns on freeform buildings identified in this study can help clients make informed decisions regarding undertaking freeform projects as well as help consultants and contractors minimize the risk of encountering such overruns.
引用
收藏
页码:1442 / 1450
页数:8
相关论文
共 50 条
  • [21] Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana
    Famiyeh S.
    Amoatey C.T.
    Adaku E.
    Agbenohevi C.S.
    Journal of Engineering, Design and Technology, 2017, 15 (02) : 181 - 198
  • [22] Significant Factors Causing Cost Overruns in Telecommunication Projects in Nigeria
    Ameh, Oko John
    Soyingbe, Aliu Adebayo
    Odusami, Koleola Tunwase
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2010, 15 (02) : 49 - 67
  • [23] Cost overruns of public sector construction projects: a developing country perspective
    Asiedu, Richard Ohene
    Adaku, Ebenezer
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 13 (01) : 66 - 84
  • [24] Study on Time and Cost Overruns in Mega Infrastructure Projects in India
    Narayanan S.
    Kure A.M.
    Palaniappan S.
    Journal of The Institution of Engineers (India): Series A, 2019, 100 (01) : 139 - 145
  • [25] TECHNIQUES TO REDUCE COST OVERRUNS DURING THE DESIGN PHASE OF CONSTRUCTION PROJECTS
    Albtoush, A. M. Faten
    Doh, S., I
    Al-Btoush, A. K. A. Mohammad
    Rahman, R. A.
    JOURNAL OF ENGINEERING SCIENCE AND TECHNOLOGY, 2022, 17 (01): : 583 - 603
  • [26] Reckoning construction cost overruns in building projects through methodological consequences
    Annamalaisami, Cindrela Devi
    Kuppuswamy, Ananthanarayanan
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (06) : 1079 - 1089
  • [27] CONSTRUCTION CLAIMS AND DISPUTES - CAUSES AND COST/TIME OVERRUNS
    SEMPLE, C
    HARTMAN, FT
    JERGEAS, G
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (04): : 785 - 795
  • [28] Theoretical framework of the causes of construction time and cost overruns
    Ullah, K.
    Abdullah, A. H.
    Nagapan, S.
    Suhoo, S.
    Khan, M. S.
    GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
  • [29] Economic and Time Risk Factors Influencing the Construction Projects: A Case Study of Lebanese Construction Projects
    Ahmad, Omar
    Nouban, Fatemeh
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2023, 17 (03) : 399 - 407
  • [30] Unearthing direct and indirect material waste-related factors underpinning cost overruns in construction projects
    Okonkwo, C.
    Evans, U. F.
    Ekung, S.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (13) : 2298 - 2304