Optimization of Pre-Splitting Blasting Hole Network Parameters and Engineering Applications in Open Pit Mine

被引:9
|
作者
Wang, Ziyi [1 ]
Wu, Guiyi [1 ]
Zhou, Lang [1 ]
机构
[1] Guizhou Univ, Coll Min, Resources & Environm, Guiyang 550025, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2022年 / 12卷 / 10期
基金
中国国家自然科学基金;
关键词
pre-splitting blasting; hole network parameters; stress wave propagation; peak stress; field verification;
D O I
10.3390/app12104930
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
In order to optimize the parameters of a pre-splitting blasting hole network, taking an open-pit mine in Inner Mongolia as the engineering background, the numerical models of different pore sizes and hole spacing were established by LS-DYNA software. The stress wave propagation law, peak stress change and rock fracture state under various working conditions were analyzed. The optimization formula of a hole network relationship was proposed and verified on site. The results show that the shock wave generated by the explosion propagates rapidly upward from the explosion source and forms a plastic flow zone around the two boreholes. The energy consumption is the largest at this stage. With the propagation of the stress wave, energy dissipates, and its waveform gradually attenuates to a compression wave and seismic wave. In each working condition, a 110 mm aperture first cracked in the stress wave superposition area compared with other working conditions, while a 120 mm aperture delayed evolution to the seismic wave compared with different borehole aperture, and the energy attenuation rate is the slowest. Meanwhile, the fastest energy attenuation rate is with the 130 mm borehole aperture. With the attenuation of the propagation energy of the stress wave, among the four measuring points set at the center of the connection between the two boreholes, the Y-direction stress of the observation points B, C and D is stable between 2.3 and 3.5 MPa, and the Y-direction stress of the observation point A is strenuous between -1.3 and 1.2 MPa. The B, C and D observation points of 90-130 mm aperture conditions showed rock cracking at 7-9 times, 7-9 times, 7-10 times, 7-11 times, and 7-11 times hole spacing, respectively. The cracks of the two boreholes were interconnected. The optimal hole network relationship is obtained by fitting: y = 1.12 + 0.076x, where y is the optimal hole diameter and hole spacing multiple, and x is the hole diameter, which is verified by engineering. After blasting, the slope is smooth and smooth, and the half-hole rate is guaranteed to be above 90%.
引用
收藏
页数:17
相关论文
共 49 条
  • [41] Improvement of deep-level mining systems based on optimization of accessing and open pit mine parameters
    Sakantsev, G. G.
    Sakantsev, M. G.
    Cheskidov, V. I.
    Norri, V. K.
    JOURNAL OF MINING SCIENCE, 2014, 50 (04) : 714 - 718
  • [42] 5G Private Network Deployment Optimization Based on RWSSA in Open-Pit Mine
    Chang, Zhaozhao
    Gu, Qinghua
    Lu, Caiwu
    Zhang, Yanhong
    Ruan, Shunling
    Jiang, Song
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2022, 18 (08) : 5466 - 5476
  • [44] The Optimization Research on Large-diameter Longhole Blasting Parameters of Underground Mine Based on Artificial Neural Network
    Pan Dong
    Zhou Keping
    Li Na
    Deng Hongwei
    Li Kui
    Jiang Fuliang
    ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL I, PROCEEDINGS, 2009, : 419 - 422
  • [45] Optimization of neural network parameters in improvement of particulate matter concentration prediction of open-pit mining
    Lu, Xiang
    Zhou, Wei
    Ly, Hai Bang
    Qi, Chongchong
    Nguyen, Thuy-Anh
    Nguyen, May Huu
    Huang, Jiandong
    Pham, Binh Thai
    APPLIED SOFT COMPUTING, 2023, 147
  • [46] Optimization of the remaining ditch mode and parameters for end-wall covered of open pit coal mine with partition and inner dumping
    Ma L.
    Wang H.
    Luo K.
    Li R.
    Jin X.
    Chang Z.
    Meitan Xuebao/Journal of the China Coal Society, 2024, 49 (04): : 1834 - 1844
  • [47] Modeling spatial variability of mechanical parameters of layered rock masses and its application in slope optimization at the open-pit mine
    Li, Jinduo
    Yang, Tianhong
    Liu, Feiyue
    Zhao, Yong
    Liu, Honglei
    Deng, Wenxue
    Gao, Yuan
    Li, Haibin
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2024, 181
  • [48] Artificial Neural Network Optimized by Modified Particle Swarm Optimization for Predicting Peak Particle Velocity Induced by Blasting Operations in Open Pit Mines
    Bui, Xuan-Nam
    Nguyen, Hoang
    Nguyen, Truc Anh
    INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2021, (02): : 79 - 90
  • [49] Optimization of overcasting blast-dragline casting mining technology system's parameters in fault subsidence zone of Heidaigou Open-pit Coal Mine
    Zhao J.
    Sun J.
    Bai R.
    Wang D.
    Liu X.
    Xu Z.
    Tang X.
    Meitan Xuebao/Journal of the China Coal Society, 2020, 45 (10): : 3453 - 3461