Optimization of Pre-Splitting Blasting Hole Network Parameters and Engineering Applications in Open Pit Mine

被引:9
|
作者
Wang, Ziyi [1 ]
Wu, Guiyi [1 ]
Zhou, Lang [1 ]
机构
[1] Guizhou Univ, Coll Min, Resources & Environm, Guiyang 550025, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2022年 / 12卷 / 10期
基金
中国国家自然科学基金;
关键词
pre-splitting blasting; hole network parameters; stress wave propagation; peak stress; field verification;
D O I
10.3390/app12104930
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
In order to optimize the parameters of a pre-splitting blasting hole network, taking an open-pit mine in Inner Mongolia as the engineering background, the numerical models of different pore sizes and hole spacing were established by LS-DYNA software. The stress wave propagation law, peak stress change and rock fracture state under various working conditions were analyzed. The optimization formula of a hole network relationship was proposed and verified on site. The results show that the shock wave generated by the explosion propagates rapidly upward from the explosion source and forms a plastic flow zone around the two boreholes. The energy consumption is the largest at this stage. With the propagation of the stress wave, energy dissipates, and its waveform gradually attenuates to a compression wave and seismic wave. In each working condition, a 110 mm aperture first cracked in the stress wave superposition area compared with other working conditions, while a 120 mm aperture delayed evolution to the seismic wave compared with different borehole aperture, and the energy attenuation rate is the slowest. Meanwhile, the fastest energy attenuation rate is with the 130 mm borehole aperture. With the attenuation of the propagation energy of the stress wave, among the four measuring points set at the center of the connection between the two boreholes, the Y-direction stress of the observation points B, C and D is stable between 2.3 and 3.5 MPa, and the Y-direction stress of the observation point A is strenuous between -1.3 and 1.2 MPa. The B, C and D observation points of 90-130 mm aperture conditions showed rock cracking at 7-9 times, 7-9 times, 7-10 times, 7-11 times, and 7-11 times hole spacing, respectively. The cracks of the two boreholes were interconnected. The optimal hole network relationship is obtained by fitting: y = 1.12 + 0.076x, where y is the optimal hole diameter and hole spacing multiple, and x is the hole diameter, which is verified by engineering. After blasting, the slope is smooth and smooth, and the half-hole rate is guaranteed to be above 90%.
引用
收藏
页数:17
相关论文
共 49 条
  • [31] Crack Extension Characteristics of Deep Hole Pre-splitting Blasting Under Different In-Situ Stress Fields and Drill Geometries: A Numerical Study
    Hao, Qi
    Cao, Anye
    Lyu, Weidong
    Wang, Changbin
    Yan, Liheng
    Lyu, Guowei
    ROCK MECHANICS AND ROCK ENGINEERING, 2025, 58 (02) : 1427 - 1449
  • [32] Case Study on Pre-Splitting Blasting Reasonable Parameters of Goaf-Side Entry Retained by Roof Cutting for Hard Main Roof
    Zhu, Hengzhong
    Wang, Huajun
    PROCESSES, 2023, 11 (02)
  • [33] Optimization of blasting parameters in opencast mine with the help of firefly algorithm and deep neural network
    Sunil Kumar Bisoyi
    Bhatu Kumar Pal
    Sādhanā, 47
  • [34] Optimization of blasting parameters in opencast mine with the help of firefly algorithm and deep neural network
    Bisoyi, Sunil Kumar
    Pal, Bhatu Kumar
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2022, 47 (03):
  • [35] Optimization of blasting parameters and prediction of vibration effects in open pit mines based on deep neural networks
    Bai, Runcai
    Zhang, Pengfei
    Zhang, Zhiqiang
    Sun, Xue
    Fei, Honglu
    Bao, Shijie
    Hu, Gang
    Li, Wenyan
    ALEXANDRIA ENGINEERING JOURNAL, 2023, 70 : 261 - 271
  • [36] Simulation and Parameters Optimization of Medium Deep Hole Blasting in Steeply Narrow Vein Mine Under Confinement
    An, Long
    Zhang, Jia-Hua
    Li, Yuan-Hui
    Han, Lin
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2022, 43 (04): : 567 - 574
  • [37] Application of Gaussian Process Regression for Bench Blasting Rock Fragmentation Prediction and Optimization at Wolongan Open-Pit Mine
    Kinyua, Eric Munene
    Jianhua, Zhang
    Huang, Gang
    Dinaniaina, Randriamamphionona M.
    Kasomo, Richard M.
    Ullah, Sami
    MINING METALLURGY & EXPLORATION, 2024, : 2341 - 2356
  • [38] Refined Design and Optimization of Underground Medium and Long Hole Blasting Parameters-A Case Study of the Gaofeng Mine
    Gao, Feng
    Li, Xin
    Xiong, Xin
    Lu, Haichuan
    Luo, Zengwu
    MATHEMATICS, 2023, 11 (07)
  • [39] Optimization and Application of Spacing Parameter for Loosening Blasting with 24-m-High Bench in Barun Open-Pit Mine
    Yin, Zuoming
    Wang, Desheng
    Wang, Xuguang
    Dang, Zhiheng
    Li, Wantao
    SHOCK AND VIBRATION, 2021, 2021
  • [40] Improvement of deep-level mining systems based on optimization of accessing and open pit mine parameters
    G. G. Sakantsev
    M. G. Sakantsev
    V. I. Cheskidov
    V. K. Norri
    Journal of Mining Science, 2014, 50 : 714 - 718