Optimization of Pre-Splitting Blasting Hole Network Parameters and Engineering Applications in Open Pit Mine

被引:9
|
作者
Wang, Ziyi [1 ]
Wu, Guiyi [1 ]
Zhou, Lang [1 ]
机构
[1] Guizhou Univ, Coll Min, Resources & Environm, Guiyang 550025, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2022年 / 12卷 / 10期
基金
中国国家自然科学基金;
关键词
pre-splitting blasting; hole network parameters; stress wave propagation; peak stress; field verification;
D O I
10.3390/app12104930
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
In order to optimize the parameters of a pre-splitting blasting hole network, taking an open-pit mine in Inner Mongolia as the engineering background, the numerical models of different pore sizes and hole spacing were established by LS-DYNA software. The stress wave propagation law, peak stress change and rock fracture state under various working conditions were analyzed. The optimization formula of a hole network relationship was proposed and verified on site. The results show that the shock wave generated by the explosion propagates rapidly upward from the explosion source and forms a plastic flow zone around the two boreholes. The energy consumption is the largest at this stage. With the propagation of the stress wave, energy dissipates, and its waveform gradually attenuates to a compression wave and seismic wave. In each working condition, a 110 mm aperture first cracked in the stress wave superposition area compared with other working conditions, while a 120 mm aperture delayed evolution to the seismic wave compared with different borehole aperture, and the energy attenuation rate is the slowest. Meanwhile, the fastest energy attenuation rate is with the 130 mm borehole aperture. With the attenuation of the propagation energy of the stress wave, among the four measuring points set at the center of the connection between the two boreholes, the Y-direction stress of the observation points B, C and D is stable between 2.3 and 3.5 MPa, and the Y-direction stress of the observation point A is strenuous between -1.3 and 1.2 MPa. The B, C and D observation points of 90-130 mm aperture conditions showed rock cracking at 7-9 times, 7-9 times, 7-10 times, 7-11 times, and 7-11 times hole spacing, respectively. The cracks of the two boreholes were interconnected. The optimal hole network relationship is obtained by fitting: y = 1.12 + 0.076x, where y is the optimal hole diameter and hole spacing multiple, and x is the hole diameter, which is verified by engineering. After blasting, the slope is smooth and smooth, and the half-hole rate is guaranteed to be above 90%.
引用
收藏
页数:17
相关论文
共 49 条
  • [21] Evaluation and optimization of blasting approaches to reducing oversize boulders and toes in open-pit mine
    Leng, Zhendong
    Fan, Yong
    Gao, Qidong
    Hu, Yingguo
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2020, 30 (03) : 373 - 380
  • [22] Effectiveness analysis of methane-drainage by deep-hole controlled pre-splitting blasting for preventing coal and gas outburst
    CAO Shu-gang~1 LI Yong~1 LIU Yan-bao~1 ZHANG Li-qiang~1 XU A-meng~2 (1. Key Laboratory for Exploitation of Southwest Resources and Environmental Disaster Control Engineering
    2. Safety Engineering College
    International Journal of Coal Science & Technology, 2009, (02) : 166 - 170
  • [23] Blasting-Induced Peak Particle Velocity Prediction of Hole-by-Hole Blasting Operation Using Digital Electronic Detonator in Open-Pit Mine
    Ding W.
    Liu D.
    Diqiu Kexue - Zhongguo Dizhi Daxue Xuebao/Earth Science - Journal of China University of Geosciences, 2023, 48 (05): : 2000 - 2010
  • [24] Modifying Sadov's Empirical Formula for Group-Hole Blasting in Open-Pit Mine Conditions
    Li, H. Y.
    Xia, M. Z.
    Wu, J.
    Guo, D. Y.
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2023, 23 (01)
  • [25] Experimental study on pre-splitting blasting with large diameter long-hole and its application in non-pillar continuous mining
    Liu Dunwen
    Gu Desheng
    Xu Guoyuan
    PROGRESS IN MINING SCIENCE AND SAFETY TECHNOLOGY, PTS A AND B, 2007, : 831 - 836
  • [26] TECHNOLOGY OF COUPLED PERMEABILITY ENHANCEMENT OF HYDRAULIC PUNCHING AND DEEP-HOLE PRE-SPLITTING BLASTING IN A "THREE-SOFT" COAL SEAM
    Li, Pu
    Zhang, Xiaodong
    Li, Hui
    MATERIALI IN TEHNOLOGIJE, 2021, 55 (01): : 89 - 96
  • [27] Formula optimization of dust coagulation agent for application in open-pit iron ore mine blasting
    Ma, E. W.
    Wu, Q. S.
    Wu, X. Y.
    Lang, Q. C.
    Cui, Z. J.
    ADVANCES IN ENERGY, ENVIRONMENT AND MATERIALS SCIENCE, 2016, : 581 - 585
  • [28] Deep hole pre-splitting blasting technology when fully mechanized coal mining face passes through high drop fault
    Li T.
    Zhang H.
    Zhang Z.
    Jia X.
    Sun G.
    Wan X.
    Zhang X.
    Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (01): : 199 - 209
  • [29] Prediction of Dust Emission Due to Open Pit Mine Blasting Using a Hybrid Artificial Neural Network
    Shahab Hosseini
    Masoud Monjezi
    Ezzeddin Bakhtavar
    Amin Mousavi
    Natural Resources Research, 2021, 30 : 4773 - 4788
  • [30] Prediction of Dust Emission Due to Open Pit Mine Blasting Using a Hybrid Artificial Neural Network
    Hosseini, Shahab
    Monjezi, Masoud
    Bakhtavar, Ezzeddin
    Mousavi, Amin
    NATURAL RESOURCES RESEARCH, 2021, 30 (06) : 4773 - 4788