Optimization of Pre-Splitting Blasting Hole Network Parameters and Engineering Applications in Open Pit Mine

被引:9
|
作者
Wang, Ziyi [1 ]
Wu, Guiyi [1 ]
Zhou, Lang [1 ]
机构
[1] Guizhou Univ, Coll Min, Resources & Environm, Guiyang 550025, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2022年 / 12卷 / 10期
基金
中国国家自然科学基金;
关键词
pre-splitting blasting; hole network parameters; stress wave propagation; peak stress; field verification;
D O I
10.3390/app12104930
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
In order to optimize the parameters of a pre-splitting blasting hole network, taking an open-pit mine in Inner Mongolia as the engineering background, the numerical models of different pore sizes and hole spacing were established by LS-DYNA software. The stress wave propagation law, peak stress change and rock fracture state under various working conditions were analyzed. The optimization formula of a hole network relationship was proposed and verified on site. The results show that the shock wave generated by the explosion propagates rapidly upward from the explosion source and forms a plastic flow zone around the two boreholes. The energy consumption is the largest at this stage. With the propagation of the stress wave, energy dissipates, and its waveform gradually attenuates to a compression wave and seismic wave. In each working condition, a 110 mm aperture first cracked in the stress wave superposition area compared with other working conditions, while a 120 mm aperture delayed evolution to the seismic wave compared with different borehole aperture, and the energy attenuation rate is the slowest. Meanwhile, the fastest energy attenuation rate is with the 130 mm borehole aperture. With the attenuation of the propagation energy of the stress wave, among the four measuring points set at the center of the connection between the two boreholes, the Y-direction stress of the observation points B, C and D is stable between 2.3 and 3.5 MPa, and the Y-direction stress of the observation point A is strenuous between -1.3 and 1.2 MPa. The B, C and D observation points of 90-130 mm aperture conditions showed rock cracking at 7-9 times, 7-9 times, 7-10 times, 7-11 times, and 7-11 times hole spacing, respectively. The cracks of the two boreholes were interconnected. The optimal hole network relationship is obtained by fitting: y = 1.12 + 0.076x, where y is the optimal hole diameter and hole spacing multiple, and x is the hole diameter, which is verified by engineering. After blasting, the slope is smooth and smooth, and the half-hole rate is guaranteed to be above 90%.
引用
收藏
页数:17
相关论文
共 49 条
  • [1] Study on blasting parameters optimization in Anjialing open-pit mine
    Huang Xiaoming
    Zhang Ruixin
    Sun Qiang
    PROGRESS IN MINING SCIENCE AND SAFETY TECHNOLOGY, PTS A AND B, 2007, : 793 - 798
  • [2] The Numerical Simulation and Optimization of the Pre-splitting Crack's Length in Underground Deep Hole Blasting
    Jiang, Fuliang
    Sheng, Yu
    Li, Xiangyang
    Xia, Meiqiong
    Zhan, Jing
    MATERIALS, MECHANICAL ENGINEERING AND MANUFACTURE, PTS 1-3, 2013, 268-270 : 717 - 720
  • [3] Permeability enhancement of deep hole pre-splitting blasting in the low permeability coal seam of the Nanting coal mine
    Ti, Zhengyi
    Zhang, Feng
    Pan, Jin
    Ma, Xiaofei
    Shang, Zheng
    PLOS ONE, 2018, 13 (06):
  • [4] Design of controlled blasting (pre-splitting) in Golegohar iron ore mine, Iran
    Dindarloo, S. R.
    Askarnejad, N. -A.
    Ataei, M.
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2015, 124 (01): : 64 - 68
  • [5] Key Parameters of the Roof Cutting and Pressure Relief Technology in the Pre-Splitting Blasting of a Hard Roof in Guqiao Coal Mine
    You, Hanlin
    Liu, Zegong
    Applied Sciences (Switzerland), 2024, 14 (24):
  • [6] Distribution Characteristics of Fragments Size and Optimization of Blasting Parameters Under Blasting Impact Load in Open-Pit Mine
    Ding, Xiaohua
    Zhou, Wei
    Lu, Xiang
    Li, Ming
    Manda, Ebelia
    Shi, Xuyang
    Luan, Boyu
    Qi, Chongchong
    IEEE ACCESS, 2019, 7 : 137501 - 137516
  • [8] Prediction and Optimization of Open-Pit Mine Blasting Based on Intelligent Algorithms
    Guo, Jiang
    Zhao, Zekun
    Zhao, Peidong
    Chen, Jingjing
    APPLIED SCIENCES-BASEL, 2024, 14 (13):
  • [9] Optimization study of blasting operations in Rosia Poieni open pit mine, Romania
    Toderas, Mihaela
    MINING OF MINERAL DEPOSITS, 2021, 15 (04): : 43 - 55
  • [10] Study on the technology of permeability enhancement of deep hole pre-splitting blasting in a low-permeability coal seam
    Li, Hui
    Zhang, Kanglin
    Zu, Haodong
    Qian, Jifa
    ENVIRONMENTAL EARTH SCIENCES, 2024, 83 (01)