Resource-constrained Scheduling of a Real Project from the Construction Industry: A Comparison of Software Packages for Project Management

被引:4
|
作者
Trautmann, N. [1 ]
Baumann, P. [1 ]
机构
[1] Univ Bern, Dept Business Adm, Bern, Switzerland
关键词
Project management; resource-constrained scheduling; construction industry; software; ALLOCATION; MICROCOMPUTER;
D O I
10.1109/IEEM.2009.5373255
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Commercial software packages for project management apply proprietary, heuristic procedures for resource-constrained scheduling. We analyze the scheduling performance of seven such packages. Three of them offer the possibility to select the priority rule to be used for the resource-constrained scheduling procedure. The project duration obtained strongly depends on this rule. Some packages know several thousand priority rules; in general, it is impossible to predict which rule provides the best result for a given project. By analyzing 1560 projects of an internationally recognized benchmark library, we propose a set of three rules for each package. We apply these rules to a real project from the construction industry. For each of the three packages, the project duration obtained by this set of rules is among the best results for all available rules, and is shorter than the project duration obtained by the packages which do not offer alternative priority rules.
引用
收藏
页码:628 / 632
页数:5
相关论文
共 50 条
  • [1] Disruption management for resource-constrained project scheduling
    Zhu, G
    Bard, JF
    Yu, G
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (04) : 365 - 381
  • [2] Construction Schedule Management Using Resource-Constrained Project Scheduling Model
    Wang J.
    Zeng S.
    Ju J.
    Tongji Daxue Xuebao/Journal of Tongji University, 2017, 45 (10): : 1561 - 1568
  • [3] Fuzzy resource-constrained project scheduling for GIS software development
    Bershtein, L.
    Knyazeva, M.
    Rozenberg, I.
    PROCEEDINGS OF THE 2015 CONFERENCE OF THE INTERNATIONAL FUZZY SYSTEMS ASSOCIATION AND THE EUROPEAN SOCIETY FOR FUZZY LOGIC AND TECHNOLOGY, 2015, 89 : 1542 - 1548
  • [4] Fuzzy Resource-Constrained Project Scheduling Problem for Software Development
    WANG Xianggang1
    2. State Key Laboratory of Software Engineering
    Wuhan University Journal of Natural Sciences, 2010, 15 (01) : 25 - 30
  • [5] Resource-constrained project scheduling - Minimization of project duration
    不详
    PROJECT SCHEDULING WITH TIME WINDOWS AND SCARCE RESOURCES, 2002, 508 : 21 - 174
  • [6] Resource-constrained project scheduling and timetabling
    Brucker, P
    Knust, S
    PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 277 - 293
  • [7] COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DAVIS, EW
    PATTERSON, JH
    MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08): : 944 - 955
  • [8] Extending the Resource-Constrained Project Scheduling Problem for Disruption Management
    Kuster, Juergen
    Jannach, Dietmar
    INTELLIGENT TECHNIQUES AND TOOLS FOR NOVEL SYSTEM ARCHITECTURES, 2008, 109 : 43 - 61
  • [9] Extending the resource-constrained project scheduling problem for disruption management
    Kuster, Juergen
    Jannach, Dietmar
    2006 3RD INTERNATIONAL IEEE CONFERENCE INTELLIGENT SYSTEMS, VOLS 1 AND 2, 2006, : 91 - 98
  • [10] PRAC: A Software System to Solve the Resource-constrained Project Scheduling Problem
    Zhang, Mao-sheng
    Zhao, Ying
    Cao, Bo
    2016 INTERNATIONAL CONFERENCE ON BUSINESS AND MANAGEMENT (ICBM 2016), 2016, : 37 - 42