Multidimensional behavioral responses to the implementation of BIM in construction projects: an empirical study in China

被引:25
|
作者
Cao, Dongping [1 ]
Shao, Shiting [1 ]
Huang, Bin [2 ]
Wang, Guangbin [1 ]
机构
[1] Tongji Univ, Dept Construct Management & Real Estate, Shanghai, Peoples R China
[2] Shanghai Lujiazui Finance & Trade Zone Dev Co Ltd, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Building information modeling (BIM); Construction projects; Technology acceptance; Technology resistance; Chinese construction industry; BUILDING INFORMATION MODEL; USER RESISTANCE; TECHNOLOGY; ADOPTION; ANTECEDENTS; ACCEPTANCE; CAPABILITIES; PERCEPTIONS; ATTITUDES; DESIGN;
D O I
10.1108/ECAM-09-2020-0735
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Despite its great potential to improve the sustainability of architectural, engineering, construction and facility management activities, the implementation of building information modeling (BIM) in many projects has failed to achieve expected benefits due to negative behavioral responses such as user resistance. This paper aims to characterize the complexity of end user's behavioral responses to BIM implementation in construction projects using a multidimensional perspective and examines how these responses are impacted by different levels of contextual factors. Design/methodology/approach By integrating technology acceptance, resistance and adoption literature, this paper theoretically proposes a research model to characterize the associations between different dimensions of behavioral responses and different levels of contextual factors. The model is then empirically tested with survey and interview data collected from BIM-based construction projects in China. Findings The empirical results not only validate the two-dimensional view of the behavioral responses (i.e. the dimension of support/resistance that ranges from aggressive resistance to enthusiastic support, and the dimension of actual use that ranges from non-use to high use) but also provide evidence for the prevalence of ambivalent responses such as supporting but lowly using and resisting but highly using. The empirical results also provide evidence that different levels of contextual factors generally play different roles in shaping the behavioral responses. Specifically, the dimension of support/resistance is more substantially impacted by the team-level factor while the dimension of actual use of BIM is more significantly associated with the project-level factor. Originality/value While previous research on BIM adoption or implementation behaviors has primarily focused on investigating users' response from single-dimension perspectives such as acceptance or non-acceptance, this study represents an exploratory effort of using a two-dimensional view to characterize the complexity and ambivalence of end users' behavioral responses to the implementation of innovative technologies such as BIM in construction projects. This study also contributes to deepened understandings of how these different dimensions of behavioral responses are intricately shaped by different levels (i.e. individual-, team- and project-levels) of contextual factors in construction projects which are characterized as temporary and inter-organizational.
引用
收藏
页码:819 / 841
页数:23
相关论文
共 50 条
  • [1] Identifying and contextualising the motivations for BIM implementation in construction projects: An empirical study in China
    Cao, Dongping
    Li, Heng
    Wang, Guangbin
    Huang, Ting
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (04) : 658 - 669
  • [2] A study on BIM implementation of construction projects for PCM during the construction phase
    Lin Y.-C.
    Lin C.-P.
    Shueh T.-S.
    Hu H.-T.
    Journal of the Chinese Institute of Civil and Hydraulic Engineering, 2020, 32 (02): : 239 - 250
  • [3] PREDICTING BEHAVIOURAL RESISTANCE TO BIM IMPLEMENTATION IN CONSTRUCTION PROJECTS: AN EMPIRICAL STUDY INTEGRATING TECHNOLOGY ACCEPTANCE MODEL AND EQUITY THEORY
    Wang, Guangbin
    Wang, Pengfei
    Cao, Dongping
    Luo, Xiaochun
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (07) : 651 - 665
  • [4] Status of BIM implementation in the Dominican Republic construction industry - an empirical study
    Silverio, Ana Karina
    Suresh, Subashini
    Renukappa, Suresh
    Heesom, David
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2023, 21 (02) : 417 - 441
  • [5] Enhancing BIM implementation in the Ethiopian public construction sector: An empirical study
    Belay, Solomon
    Goedert, James
    Woldesenbet, Asregedew
    Rokooei, Saeed
    COGENT ENGINEERING, 2021, 8 (01):
  • [6] Barriers to BIM Implementation in Architecture, Construction, and Engineering Projects-The Polish Study
    Lesniak, Agnieszka
    Gorka, Monika
    Skrzypczak, Izabela
    ENERGIES, 2021, 14 (08)
  • [7] An Empirical Study on the Acceptance of 4D BIM in EPC Projects in China
    Gong, Pan
    Zeng, Ningshuang
    Ye, Kunhui
    Koenig, Markus
    SUSTAINABILITY, 2019, 11 (05)
  • [8] Contagion of BIM Implementation Practices in Interproject Networks: An Empirical Study in China
    Shao, Shiting
    Cao, Dongping
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2024, 40 (01)
  • [9] Understanding effects of BIM on collaborative design and construction: An empirical study in China
    Liu, Yan
    Van Nederveen, Sander
    Hertogh, Marcel
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (04) : 686 - 698
  • [10] Implementation of augmented reality in BIM-enabled construction projects: a bibliometric literature review and a case study from China
    Wang, Kaiyang
    Guo, Fangyu
    Zhou, Ruijia
    Qian, Liang
    CONSTRUCTION INNOVATION-ENGLAND, 2024, 24 (04): : 1085 - 1116