Experience in the use of FIDIC contracts on rail infrastructure projects

被引:1
|
作者
Bralic, Edvin [1 ]
机构
[1] Invest Inzenjering Doo, Zagreb, Croatia
来源
GRADEVINAR | 2019年 / 71卷 / 11期
关键词
FIDIC contracts; minimum amount of interim certificate; advance payment; guarantees; retention money; additional work;
D O I
10.14256/JCE.2710.2019
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The use of CIDIC general conditions of contract in the re lisat on of rail nfrastructure ronstrurtion works is presented in the paper. Contract limitations are analyzed such as: minimum amount of interim certificates, advance payment, scheduling repayment of advance payment, guarantees and retention money, work contract procurement according to FIDIC Red Book, conditions of rontrart for works designed by the Employer without ronstruction documents at the time of procurement, realisation of work under traffic, preliminary work, railway track closure, problems relating to interim certificates for additional vvork, and contract procedures.
引用
收藏
页码:987 / 993
页数:7
相关论文
共 50 条
  • [1] FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects
    Bodea, Constanta-Nicoleta
    Purnus, Augustin
    JURIDICAL TRIBUNE-TRIBUNA JURIDICA, 2016, 6 (02): : 165 - 181
  • [2] Use of design-build-operate contracts for infrastructure projects
    Schaufelberger, JE
    CONSTRUCTION INNOVATION AND GLOBAL COMPETITIVENESS, VOLS 1 AND 2: THE ORGANIZATION AND MANAGEMENT OF CONSTRUCTION, 2003, : 799 - 807
  • [4] ONE MODEL FOR RAIL INFRASTRUCTURE PROJECTS SELECTION
    Macura, Dragana
    Nuhodzic, Resad
    Bojovic, Nebojsa
    Knezevic, Nikola
    ROAD AND RAIL INFRASTRUCTURE II, 2012, : 533 - 538
  • [5] Hazard Management with DOORS: Rail Infrastructure Projects
    Hughes, Dave
    Saeed, Amer
    SAFETY-CRITICAL SYSTEMS: PROBLEMS, PROCESS AND PRACTICE, 2009, : 71 - 93
  • [6] Off the rails: The cost performance of infrastructure rail projects
    Love, Peter E. D.
    Zhou, Jingyang
    Edwards, David J.
    Irani, Zahir
    Sing, Chun-Pong
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2017, 99 : 14 - 29
  • [7] Effective strategy implementation through rail infrastructure projects
    Bonhomme, B. E.
    Marnewick, A. L.
    Marnewick, C.
    2022 IEEE TECHNOLOGY AND ENGINEERING MANAGEMENT CONFERENCE (TEMSCON EUROPE), 2022, : 124 - 129
  • [8] A MODEL FOR PRIORITIZATION OF RAIL INFRASTRUCTURE PROJECTS USING ANP
    Macura, Dragana
    Boskovic, Branislav
    Bojovic, Nebojsa
    Milenkovic, Milos
    INTERNATIONAL JOURNAL OF TRANSPORT ECONOMICS, 2011, 38 (03) : 285 - 309
  • [9] Fidic Contracts: Law and Practice
    Gould, Nicholas
    Loosemore, David
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2011, 164 (02) : 104 - 104