The traditional procurement strategy for most infrastructure projects in the United States historically has been design-bid-build. The Seattle Public Utilities department has selected a design-build-operate procurement strategy for the construction and operation of two major water filtration facilities. This alternative strategy was selected because the city, lacked experience in plant design, construction, and operation and desired to minimize its life-cycle costs for the projects. This paper describes the procedures used by the city, and the results obtained. Construction of the first plant has been completed, and it is now in operation. The second plant is currently under construction. The city, estimates that it saved about 40% in life-cycle costs for the first plant and about 30% on the second one.
引用
收藏
页码:799 / 807
页数:3
相关论文
共 50 条
  • [1] NEC contracts for design-build-operate contracts
    Patterson, Richard L.
    Trebes, Barry
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2013, 166 (05) : 260 - 268
  • [2] Design-build-operate and the privatization of water and wastewater treatment
    Arnold, RG
    JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 1997, 123 (07): : 623 - 624
  • [3] Radio Network Planning using a Design-Build-Operate Model
    Cosnita, Romeo
    Caba, Cristian
    Nafornita, Ioan
    2017 INTERNATIONAL SYMPOSIUM ON SIGNALS, CIRCUITS AND SYSTEMS (ISSCS), 2017,
  • [4] EnergyPlus model-based predictive control within design-build-operate energy information modelling infrastructure
    Zhao, Jie
    Khee Poh Lam
    Ydstie, B. Erik
    Karaguzel, Omer T.
    JOURNAL OF BUILDING PERFORMANCE SIMULATION, 2015, 8 (03) : 121 - 134
  • [6] Build-operate-transfer in infrastructure projects in the United States
    Algarni, Ayed Muhammad
    Arditi, David
    Polat, Gul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (10) : 728 - 735
  • [7] Innovation outcomes and processes in infrastructure projects - a comparative study of Design-Build and Design-Build-Maintenance contracts
    Larsson, Johan
    Eriksson, Per Erik
    Lingegard, Sofia
    Jarvenpaa, Anna-Therese
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2022, 40 (02) : 142 - 156
  • [8] Risk management for build-operate-transfer infrastructure projects in China
    Liang, Wen
    Sixth Wuhan International Conference on E-Business, Vols 1-4: MANAGEMENT CHALLENGES IN A GLOBAL WORLD, 2007, : 2646 - 2651
  • [9] Determine the factors that affecting on the applicability of Build Operate Transfer contracts for infrastructure in Iraq
    Kaleel, Tareq A.
    Kareem, Muntadher
    2ND INTERNATIONAL CONFERENCE ON SUSTAINABLE ENGINEERING TECHNIQUES (ICSET 2019), 2019, 518
  • [10] Exploring critical failure factors in BOT (Build, operate,and transfer) infrastructure projects
    Guofo, YE
    Liu, YZ
    PROCEEDINGS OF THE 2005 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (12TH), VOLS 1- 3, 2005, : 1811 - 1814