Experience in the use of FIDIC contracts on rail infrastructure projects

被引:1
|
作者
Bralic, Edvin [1 ]
机构
[1] Invest Inzenjering Doo, Zagreb, Croatia
来源
GRADEVINAR | 2019年 / 71卷 / 11期
关键词
FIDIC contracts; minimum amount of interim certificate; advance payment; guarantees; retention money; additional work;
D O I
10.14256/JCE.2710.2019
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The use of CIDIC general conditions of contract in the re lisat on of rail nfrastructure ronstrurtion works is presented in the paper. Contract limitations are analyzed such as: minimum amount of interim certificates, advance payment, scheduling repayment of advance payment, guarantees and retention money, work contract procurement according to FIDIC Red Book, conditions of rontrart for works designed by the Employer without ronstruction documents at the time of procurement, realisation of work under traffic, preliminary work, railway track closure, problems relating to interim certificates for additional vvork, and contract procedures.
引用
收藏
页码:987 / 993
页数:7
相关论文
共 50 条
  • [21] Circular economy implementation strategies, barriers and enablers for UK rail infrastructure projects
    OLeary, Matthew James
    Osmani, Mohamed
    Goodier, Chris
    RESOURCES CONSERVATION & RECYCLING ADVANCES, 2024, 21
  • [22] APPRAISAL OF RAIL INVESTMENT PROJECTS - RECENT BRITISH-EXPERIENCE
    NASH, C
    PRESTON, J
    TRANSPORT REVIEWS, 1991, 11 (04) : 295 - 309
  • [23] Major rail contracts
    Civil Engineers Australia, 2002, 74 (07):
  • [24] Investigating the performance of PPP in major healthcare infrastructure projects: the role of policy, institutions, and contracts
    Vecchi, Veronica
    Cusumano, Niccolo
    Casalini, Francesca
    OXFORD REVIEW OF ECONOMIC POLICY, 2022, 38 (02) : 385 - 401
  • [25] Application of FIDIC Contracts under the Egyptian Civil Code
    Shafik, Noha
    Qodsi, Sahar
    Serag, Engy
    Helmi, Moustafa
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2016, 8 (03)
  • [26] Global Infrastructure Issues Detailed in FIDIC Report
    Cardno, Catherine A.
    CIVIL ENGINEERING, 2009, 79 (12): : 32 - 33
  • [27] Operational Barriers against the Use of Smart Contracts in Construction Projects
    Kunkcu, Handan
    Koc, Kerim
    Gurgun, Asli Pelin
    Dagou, Houljakbe Houlteurbe
    TURKISH JOURNAL OF CIVIL ENGINEERING, 2023, 34 (05): : 81 - 106
  • [28] Use of iron ore mine tailings in infrastructure projects
    Shubhananda Rao P.
    Gayana B.C.
    Ram Chandar K.
    International Journal of Mining and Mineral Engineering, 2019, 10 (01) : 51 - 67
  • [29] Contracts for environmental projects
    Hills, Jeffrey W.
    Military Engineer, 1995, 87 (573):
  • [30] Road map to BIM use for infrastructure domains: Identifying and contextualizing variables of infrastructure projects
    Ghasemzadeh B.
    Celik T.
    Karimi Ghaleh Jough F.
    Matthews J.C.
    Scientia Iranica, 2022, 29 (6 A) : 2803 - 2824