Productivity and age: Evidence from work teams at the assembly line

被引:75
|
作者
Boersch-Supan, Axel [1 ,2 ,3 ]
Weiss, Matthias [1 ,4 ,5 ,6 ]
机构
[1] Max Planck Inst Social Law & Social Policy, Munich Ctr Econ Aging MEA, Amalienstr 33, D-80799 Munich, Germany
[2] Tech Univ Munich, Cambridge, MA USA
[3] Natl Bur Econ Res, Cambridge, MA 02138 USA
[4] Ostbayer Tech Hsch Regensburg, Seybothstr 2, D-93053 Regensburg, Germany
[5] Maastricht Univ, Res Ctr Educ, NL-6200 MD Maastricht, Netherlands
[6] Maastricht Univ, Labour Market ROA, NL-6200 MD Maastricht, Netherlands
来源
关键词
Age-productivity profiles; EARNINGS PROFILES; WAGES; INCENTIVES; PERFORMANCE; WORKFORCE; SAMPLE;
D O I
10.1016/j.jeoa.2015.12.001
中图分类号
C921 [人口统计学];
学科分类号
摘要
The authors study the relation between workers' age and their productivity in work teams, based on a new and unique data set that combines data on errors occurring in the production process of a large car manufacturer with detailed information on the personal characteristics of workers related to the errors. The authors correct for non-random sample selection and the potential endogeneity of the age-composition in work teams. The results suggest that productivity in this plant which is typical for large-scale manufacturing does not decline at least up to age 60. (C) 2016 Published by Elsevier B.V.
引用
收藏
页码:30 / 42
页数:13
相关论文
共 50 条
  • [1] WORK TEAMS BOOST PRODUCTIVITY
    SCHILDER, J
    PERSONNEL JOURNAL, 1992, 71 (02) : 67 - 71
  • [2] Impact of work teams: a comparison study of assembly cells and assembly line for a variety of operating environments
    Sengupta, K
    Jacobs, FR
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (19) : 4173 - 4193
  • [3] Knowledge work productivity in distributed teams
    Bosch-Sijtsema, Petra M.
    Ruohomaki, Virpi
    Vartiainen, Matti
    JOURNAL OF KNOWLEDGE MANAGEMENT, 2009, 13 (06) : 533 - 546
  • [4] Performance implications of assembly work teams
    McCreery, JK
    Krajewski, LJ
    Leong, GK
    Ward, PT
    DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1349 - 1351
  • [5] Performance implications of assembly work teams
    McCreery, JK
    Krajewski, LJ
    Leong, GK
    Ward, PT
    JOURNAL OF OPERATIONS MANAGEMENT, 2004, 22 (04) : 387 - 412
  • [6] Jig Design, Assembly Line Design and Work Station Design and their Effect to Productivity
    Saptari, Adi
    Lai, Wong Soon
    Salleh, Mohd. Rizal
    JORDAN JOURNAL OF MECHANICAL AND INDUSTRIAL ENGINEERING, 2011, 5 (01): : 9 - 16
  • [7] BALANCING ASSEMBLY LINES FOR TEAMS AND WORK GROUPS
    JOHNSON, RV
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (06) : 1205 - 1214
  • [8] MULTI-SKILLED WORK TEAMS - PRODUCTIVITY BENEFITS
    AQUILANO, NJ
    CALIFORNIA MANAGEMENT REVIEW, 1977, 19 (04) : 17 - 22
  • [9] Work Productivity of Teams with Different Pruning Tools in Olive
    Tombesi, A.
    Farinelli, D.
    Pilli, M.
    Ruffolo, M.
    VI INTERNATIONAL SYMPOSIUM ON OLIVE GROWING, 2012, 949 : 595 - 600
  • [10] Analysis of buffered assembly line productivity
    Usubamatov, Ryspek
    Alsalameh, Abd Alsalam
    Ahmad, Rosmaini
    Riza, Abdul Rahman
    ASSEMBLY AUTOMATION, 2014, 34 (01) : 34 - 40