共 50 条
- [42] Basic information on assembly-line work ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1929, 73 : 125 - 125
- [43] Application of Work Study on Assembly Line Balancing PROCEEDINGS OF 2009 CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE & SYSTEM DYNAMICS, VOL 2, 2009, : 73 - 77
- [45] Optimization of Assembly Line Based on Work Study 2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 813 - +
- [49] The Productivity Effect of Temporary Agency Work: Evidence from German Panel Data ECONOMIC JOURNAL, 2012, 122 (562): : F216 - F235
- [50] Learning to learn and productivity growth: Evidence from a new car-assembly plant OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2013, 41 (02): : 336 - 344