BALANCING ASSEMBLY LINES FOR TEAMS AND WORK GROUPS

被引:14
|
作者
JOHNSON, RV
机构
[1] School of Business Administration, University of Michigan, Ann Arbor, MI
关键词
Personnel;
D O I
10.1080/00207549108930128
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Difficulties that arise in balancing assembly lines for teams and work groups are identified and addressed. When sets of tasks are assigned to specific teams prior to balancing, task precedence requirements sometimes make it impossible to attain a balance with members of a team located contiguously along the line. Where it is possible, low balance delay might be impossible to attain. Two resolutions are offered. The product can be designed so tasks assigned to a team can be performed together, or the line can be balanced using disconnected teams. The latter approach avoids some design costs and is easier to implement, but experiments show it is likely to incur substantial balance delay and so higher labour costs. The magnitude of these costs is found to increase with the number of teams and with the percentage of tasks that can be allocated to one team only. To derive the results, new branch-and-bound approaches are provided and tested. For self-managed work groups, comments are restricted to balancing group capacities.
引用
收藏
页码:1205 / 1214
页数:10
相关论文
共 50 条
  • [1] Application of the Work Study to Balancing Hydraulic Component Assembly Lines
    Li, Wenli
    Song, Chunlei
    Han, Lisha
    MANAGEMENT, MANUFACTURING AND MATERIALS ENGINEERING, PTS 1 AND 2, 2012, 452-453 : 206 - 210
  • [2] Balancing mixed-model assembly lines to reduce work overload
    Matanachai, S
    Yano, CA
    IIE TRANSACTIONS, 2001, 33 (01) : 29 - 42
  • [3] Balancing assembly and transfer lines
    Dolgui, A
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) : 663 - 665
  • [4] Balancing of parallel assembly lines
    Gokcen, Hadi
    Agpak, Kursad
    Benzer, Recep
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 103 (02) : 600 - 609
  • [5] Balancing Individual and Collaborative Work in Agile Teams
    Barney, Hamish T.
    Moe, Nils B.
    Dyba, Tore
    Aurum, Aybueke
    Winata, Martha
    AGILE PROCESSES IN SOFTWARE ENGINEERING AND EXTREME PROGRAMMING: 10TH INTERNATIONAL CONFERENCE, XP 2009, 2009, 31 : 53 - +
  • [6] Performance implications of assembly work teams
    McCreery, JK
    Krajewski, LJ
    Leong, GK
    Ward, PT
    DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1349 - 1351
  • [7] Balancing assembly lines with tabu search
    Lapierre, SD
    Ruiz, A
    Soriano, P
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) : 826 - 837
  • [8] AN HEURISTIC METHOD FOR BALANCING ASSEMBLY LINES
    HESKIAOFF, H
    WESTERN ELECTRIC ENGINEER, 1968, 12 (03): : 9 - +
  • [9] Balancing stochastic parallel assembly lines
    Ozcan, Ugur
    COMPUTERS & OPERATIONS RESEARCH, 2018, 99 : 109 - 122
  • [10] Performance implications of assembly work teams
    McCreery, JK
    Krajewski, LJ
    Leong, GK
    Ward, PT
    JOURNAL OF OPERATIONS MANAGEMENT, 2004, 22 (04) : 387 - 412