共 50 条
- [21] Construction of the deep cut-off at the Walter F George dam GEO-SUPPORT 2004: DRILLED SHAFTS, MICROPILING, DEEP MIXING, REMEDIAL METHODS, AND SPECIALTY FOUNDATION SYSTEMS, 2004, (124): : 530 - 544
- [23] Effect of weep hole and cut-off wall on hydraulic gradient and uplift pressure under a diversion dam SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2019, 44 (04):
- [24] Reliability analysis of grouted cut-off wall systems Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 1998, 17 (Suppl):
- [25] Experimental Study on the Deformation of a Cut-Off Wall in a Landfill KSCE Journal of Civil Engineering, 2020, 24 : 1439 - 1447
- [29] Numerical simulation of interaction of cut-off wall and earth-rock dam in the reinforcement project7 PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 2181 - +
- [30] Construction of a Jet-Grouted Backup Seepage Cut-Off Wall in the John Hart North Earthfill Dam GROUTING 2017: JET GROUTING, DIAPHRAGM WALLS, AND DEEP MIXING, 2017, (289): : 92 - 101