共 50 条
- [33] Investigating the Influence of Penetration Length of Cut-off Wall on its Dynamic Interaction with Core and Foundation of Earth Dam CIVIL ENGINEERING JOURNAL-TEHRAN, 2018, 4 (12): : 3019 - 3026
- [34] Arminou Dam, Cyprus, and construction joints in diaphragm cut-off walls GEOTECHNIQUE, 2002, 52 (01): : 3 - 13
- [35] Cut-off effect by rock grouting in the area of dam-foundation PROCEEDINGS OF THE THIRTEENTH (2003) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 2, 2003, : 635 - 639
- [36] Arminou Dam, Cyprus, and construction joints in diaphragm cut-off walls 2002, Thomas Telford Services Ltd (52):
- [38] Laboratory study of leakage process for cut-off wall with crack Shuili Xuebao/Journal of Hydraulic Engineering, 2019, 50 (06): : 699 - 709
- [39] Durability assessment of a confinement cut-off wall for a phosphogypsum landfill PROCEEDINGS OF THE 16TH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOLS 1-5: GEOTECHNOLOGY IN HARMONY WITH THE GLOBAL ENVIRONMENT, 2005, : 2257 - 2260
- [40] Application of plastic concrete cut-off wall in reinforcement of reservoir 2020 3RD INTERNATIONAL CONFERENCE OF GREEN BUILDINGS AND ENVIRONMENTAL MANAGEMENT, 2020, 531