The Walter F. George dam was built in 1962 on the Chattahoochee River by the Corps of Engineers and it soon developed seepage problems. Two partial cut-offs were built in the past to attempt to remedy the situation, but the problems continued, jeopardizing the safety of the structure as well as reducing its power generating potential. In 2001 the Mobile district of the Corps advertised a design-build contract for the construction of a 200 feet deep cut-off in front of the concrete structure of the dam starting from 90 feet of water, cutting through a concrete lock structure, a submerged retaining wall and extending on both sides on the earthen embankments. The winning proposal of the joint venture of Treviicos and Rodio anticipated the use of a secant pile wall in the portion to be built in front of the structure, working from barges with a reverse circulation drilling rig, and a conventional slurry wall built with a hydromill rig for the portion out of the water.
引用
收藏
页码:530 / 544
页数:15
相关论文
共 50 条
  • [1] Arminou Dam, Cyprus, and construction joints in diaphragm cut-off walls
    Brown, AJ
    Bruggemann, DA
    GEOTECHNIQUE, 2002, 52 (01): : 3 - 13
  • [2] Construction experience of concrete cut-off wall in Xiaolangdi dam project
    Li, Ligang
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 1999, 21 (05): : 625 - 627
  • [3] Arminou Dam, Cyprus, and construction joints in diaphragm cut-off walls
    Brown, A.J.
    Bruggemann, D.A.
    2002, Thomas Telford Services Ltd (52):
  • [4] The Stress and Displacement Analysis of the Cut-Off Wall for the Deep Overburden Dam
    Zhang, Bo
    BIOTECHNOLOGY, CHEMICAL AND MATERIALS ENGINEERING, PTS 1-3, 2012, 393-395 : 463 - 466
  • [5] Cut-off wall construction
    International Division, Bauer Spezialtiefbau GmbH
    Int. Water Power Dam Constr., 2007, 2 (42-44): : 42 - 44
  • [6] Collapse episodes and remediation of subsidiary dam under construction of cut-off walls
    Zheng, Lingwei
    Xie, Xinyu
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GROUND IMPROVEMENT, 2019, 172 (02) : 108 - 115
  • [7] Completing cut-off wall construction
    Spezialtiefbau, Bauer
    International Water Power and Dam Construction, 2015, 67 (10): : 22 - 24
  • [8] Construction and performance of the Karkheh dam complementary cut-off wall: an innovative engineering solution
    Heidarzadeh, Mohammad
    Mirghasemi, Ali A.
    Niroomand, Habib
    Eslamin, Faramarz
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2019, 17 (6B) : 859 - 869
  • [9] Construction and performance of the Karkheh dam complementary cut-off wall: an innovative engineering solution
    Mohammad Heidarzadeh
    Ali A. Mirghasemi
    Habib Niroomand
    Faramarz Eslamin
    International Journal of Civil Engineering, 2019, 17 : 859 - 869
  • [10] ON DESIGN OF A RECTANGULAR DAM WITH A CENTRAL CUT-OFF WALL
    KING, GJW
    COLLINS, P
    GEOTECHNIQUE, 1968, 18 (04): : 489 - &