共 50 条
- [12] Construction of deep plastic concrete cut-off wall in upstream coffer dam of Punatsangchhu-I Hydropower Project, Bhutan PROCEEDINGS OF THE CONFERENCE ON RECENT ADVANCES IN ROCK ENGINEERING (RARE 2016), 2016, 91 : 353 - 360
- [14] Cut-off wall in foundation of reservoir dam and tailing dam: comparative evaluation MAGAZINE OF CIVIL ENGINEERING, 2024, 17 (06):
- [15] The Applications Of Concrete Cut-Off Wall In The Reinforcement Of The Earth Dam ADVANCES IN COMPOSITES, PTS 1 AND 2, 2011, 150-151 : 749 - 752
- [16] Deep diaphragm cut-off walls for dams FOURTEENTH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND FOUNDATION ENGINEERING, VOL 2, 1997, : 895 - 898
- [18] Cut-off effect by rock grouting in the area of dam-foundation PROCEEDINGS OF THE THIRTEENTH (2003) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 2, 2003, : 635 - 639
- [19] Construction of a Jet-Grouted Backup Seepage Cut-Off Wall in the John Hart North Earthfill Dam GROUTING 2017: JET GROUTING, DIAPHRAGM WALLS, AND DEEP MIXING, 2017, (289): : 92 - 101