Construction of the deep cut-off at the Walter F George dam

被引:0
|
作者
di Cervia, AR
机构
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The Walter F. George dam was built in 1962 on the Chattahoochee River by the Corps of Engineers and it soon developed seepage problems. Two partial cut-offs were built in the past to attempt to remedy the situation, but the problems continued, jeopardizing the safety of the structure as well as reducing its power generating potential. In 2001 the Mobile district of the Corps advertised a design-build contract for the construction of a 200 feet deep cut-off in front of the concrete structure of the dam starting from 90 feet of water, cutting through a concrete lock structure, a submerged retaining wall and extending on both sides on the earthen embankments. The winning proposal of the joint venture of Treviicos and Rodio anticipated the use of a secant pile wall in the portion to be built in front of the structure, working from barges with a reverse circulation drilling rig, and a conventional slurry wall built with a hydromill rig for the portion out of the water.
引用
收藏
页码:530 / 544
页数:15
相关论文
共 50 条
  • [11] Dam cut-off wall nears closing stages
    不详
    GROUND ENGINEERING, 1997, 30 (05): : 12 - 12
  • [12] Construction of deep plastic concrete cut-off wall in upstream coffer dam of Punatsangchhu-I Hydropower Project, Bhutan
    Gajbhiye, P. K.
    PROCEEDINGS OF THE CONFERENCE ON RECENT ADVANCES IN ROCK ENGINEERING (RARE 2016), 2016, 91 : 353 - 360
  • [13] Cut-off wall, diaphragm wall, piling and grouting works for the construction oftheJannah Dam in Lebanon
    Adnan, Mazin
    Baltruschat, Michael
    Abdo, Georges
    WASSERWIRTSCHAFT, 2023, 113 (06) : 48 - 51
  • [14] Cut-off wall in foundation of reservoir dam and tailing dam: comparative evaluation
    Sainov, M. P.
    Talalaev, N. S.
    MAGAZINE OF CIVIL ENGINEERING, 2024, 17 (06):
  • [15] The Applications Of Concrete Cut-Off Wall In The Reinforcement Of The Earth Dam
    Li, Jinglong
    Li, Shucai
    Li, Shuchen
    ADVANCES IN COMPOSITES, PTS 1 AND 2, 2011, 150-151 : 749 - 752
  • [16] Deep diaphragm cut-off walls for dams
    Stotzer, E
    Schopf, M
    FOURTEENTH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND FOUNDATION ENGINEERING, VOL 2, 1997, : 895 - 898
  • [17] CUT-OFF
    MORAN, R
    COMPUTER DECISIONS, 1988, 20 (08): : 65 - 69
  • [18] Cut-off effect by rock grouting in the area of dam-foundation
    Hong, WP
    Yea, GG
    Lee, H
    PROCEEDINGS OF THE THIRTEENTH (2003) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 2, 2003, : 635 - 639
  • [19] Construction of a Jet-Grouted Backup Seepage Cut-Off Wall in the John Hart North Earthfill Dam
    Gazzarrini, Paolo
    Siu, David
    Jungaro, Stephen
    GROUTING 2017: JET GROUTING, DIAPHRAGM WALLS, AND DEEP MIXING, 2017, (289): : 92 - 101
  • [20] Deep Limits and a Cut-Off Phenomenon for Neural Networks
    Avelin, Benny
    Karlsson, Anders
    JOURNAL OF MACHINE LEARNING RESEARCH, 2022, 23