Construction of the deep cut-off at the Walter F George dam

被引:0
|
作者
di Cervia, AR
机构
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The Walter F. George dam was built in 1962 on the Chattahoochee River by the Corps of Engineers and it soon developed seepage problems. Two partial cut-offs were built in the past to attempt to remedy the situation, but the problems continued, jeopardizing the safety of the structure as well as reducing its power generating potential. In 2001 the Mobile district of the Corps advertised a design-build contract for the construction of a 200 feet deep cut-off in front of the concrete structure of the dam starting from 90 feet of water, cutting through a concrete lock structure, a submerged retaining wall and extending on both sides on the earthen embankments. The winning proposal of the joint venture of Treviicos and Rodio anticipated the use of a secant pile wall in the portion to be built in front of the structure, working from barges with a reverse circulation drilling rig, and a conventional slurry wall built with a hydromill rig for the portion out of the water.
引用
收藏
页码:530 / 544
页数:15
相关论文
共 50 条
  • [31] THE CUT-OFF WHEEL
    LEITH, JA
    NEW ZEALAND MEDICAL JOURNAL, 1993, 106 (963) : 390 - 391
  • [33] CUT-OFF IN BOSTON
    DOYLE, JS
    NEW REPUBLIC, 1966, 155 (08) : 10 - 10
  • [34] ON THE RENORMALIZATION CUT-OFF
    UMEZAWA, H
    KAMEFUCHI, S
    TOMOZAWA, Y
    KONUMA, M
    PROGRESS OF THEORETICAL PHYSICS, 1956, 15 (04): : 417 - 419
  • [35] Application of concrete cut-off wall to reinforcement of earth-rock dam
    Li, Jing-Long
    Li, Shu-Cai
    Wang, Gang
    Li, Jia-Chun
    Yu, Feng
    Yantu Lixue/Rock and Soil Mechanics, 2006, 27 (SUPPL.): : 75 - 79
  • [36] Multi-Objective Hydraulic Optimization of Diversion Dam’s Cut-Off
    Nafiseh Khoramshokooh
    Mehdi Veiskarami
    Mohammad Reza Nikoo
    Somayeh Pourvahedi Roshandeh
    Water Resources Management, 2018, 32 : 3723 - 3736
  • [37] Sealing of cut-off wall joints at the Wiehl Dam at maximum operating level
    Scheuer, Lothar
    Klopsch, Helge
    Heinemannn, Ekkehard
    WASSERWIRTSCHAFT, 2018, 108 (06) : 77 - 80
  • [38] Multi-Objective Hydraulic Optimization of Diversion Dam's Cut-Off
    Khoramshokooh, Nafiseh
    Veiskarami, Mehdi
    Nikoo, Mohammad Reza
    Roshandeh, Somayeh Pourvahedi
    WATER RESOURCES MANAGEMENT, 2018, 32 (11) : 3723 - 3736
  • [39] Suffusion characteristics of a heterogeneous dam foundation with a cut-off wall of stochastic defects
    Deng, Zezhi
    Wang, Gang
    Jin, Wei
    Deng, Liangjun
    Liao, Mingke
    Chen, Qiuyi
    ENGINEERING GEOLOGY, 2025, 344
  • [40] Sealing of cut-off wall joints at the Wiehl Dam at maximum operating level
    Scheuer, Lothar
    Klopsch, Helge
    Heinemannn, Ekkehard
    WASSERWIRTSCHAFT, 2018, 108 : 75 - 77