Construction of the deep cut-off at the Walter F George dam

被引:0
|
作者
di Cervia, AR
机构
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The Walter F. George dam was built in 1962 on the Chattahoochee River by the Corps of Engineers and it soon developed seepage problems. Two partial cut-offs were built in the past to attempt to remedy the situation, but the problems continued, jeopardizing the safety of the structure as well as reducing its power generating potential. In 2001 the Mobile district of the Corps advertised a design-build contract for the construction of a 200 feet deep cut-off in front of the concrete structure of the dam starting from 90 feet of water, cutting through a concrete lock structure, a submerged retaining wall and extending on both sides on the earthen embankments. The winning proposal of the joint venture of Treviicos and Rodio anticipated the use of a secant pile wall in the portion to be built in front of the structure, working from barges with a reverse circulation drilling rig, and a conventional slurry wall built with a hydromill rig for the portion out of the water.
引用
收藏
页码:530 / 544
页数:15
相关论文
共 50 条
  • [41] The first cut-off wall in the Indian Himalayas for the dam of the Dhauliganga hydroelectric project
    Brunner, WG
    DFI 2004: DEEP FOUNDATIONS INSTITUTE, CONFERENCE PROCEEDINGS, 2004, : 207 - 212
  • [42] UNUSUAL DOUBLE-WALLED CUT-OFF INSTALLED IN DAM BASE.
    Anon
    International Construction, 1976, 15 (07): : 2 - 6
  • [43] AUTOMATION OF SURFACE IRRIGATION BY CUT-OFF TIME OR CUT-OFF DISTANCE CONTROL
    Niblack, M.
    Sanchez, C. A.
    APPLIED ENGINEERING IN AGRICULTURE, 2008, 24 (05) : 611 - 614
  • [44] Automation of surface irrigation by cut-off time or cut-off distance control
    United States Bureau of Reclamation, Yuma Area Office, 7301 Calle Agua Salada, Yuma, AZ 85364, United States
    不详
    不详
    Appl Eng Agric, 2008, 5 (611-614):
  • [45] IS APPARENT REDSHIFT CUT-OFF IN TOLOLO DEEP SURVEY REAL
    CARSWELL, RF
    SMITH, MG
    MONTHLY NOTICES OF THE ROYAL ASTRONOMICAL SOCIETY, 1978, 185 (02) : 381 - 388
  • [46] An elasto-plastic analysis for Pubugou high rockfill-earth dam with deep concrete CUT-OFF wall
    Jun, L
    Jialiu, P
    Qionghua, Y
    Yongda, W
    COMPUTATIONAL PLASTICITY: FUNDAMENTALS AND APPLICATIONS, PTS 1 AND 2, 1997, : 1679 - 1684
  • [47] Design and Construction of the Rockfill Dams and the Cut-off Wall at the Merowe Project
    Ehrhardt, Thomas
    Scheid, Yannick
    El Tayeb, Ahmed
    WASSERWIRTSCHAFT, 2011, 101 (1-2) : 36 - 42
  • [48] Study on the elastoplastic damage evolution characteristics of suspended cut-off wall of rockfill dam on ultra-deep overburden during construction and long-term operations
    Peng, Jun
    Zou, Degao
    Qu, Yongqian
    Liu, Jingmao
    Chen, Kai
    ENGINEERING STRUCTURES, 2025, 326
  • [49] Damage analysis of the cut-off wall in a landslide dam based on centrifuge and numerical modeling
    Sun, Wei
    Zhang, Ga
    Zhang, Zongliang
    COMPUTERS AND GEOTECHNICS, 2021, 130
  • [50] Influence of an Earth Dam Cut-Off Plastic Concrete Component on Its Physical Properties
    Kazemian, Sina
    Ghareh, Soheil
    GEO-CHINA 2016: NEW FRONTIERS IN CIVIL INFRASTRUCTURE, 2016, (267): : 91 - 98