Simulation based scheduling system in a semiconductor backend facility

被引:13
|
作者
Werner, Sebastian [1 ]
Horn, Sven [2 ]
Weigert, Gerald [2 ]
Jaehnig, Thomas [3 ]
机构
[1] Infineon Technol, D-01099 Dresden, Germany
[2] Tech Univ Dresden, Elect Packaging Lab, D-01062 Dresden, Germany
[3] Qimonda, D-01099 Dresden, Germany
关键词
D O I
10.1109/WSC.2006.322950
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The semiconductor manufacturing process is usually divided in two parts: frontend and backend. In contrast to the frontend, where the manufacturing process is dominated by cluster-tools and cyclic routes, the backend has a predominant linear structure. In contrast to the frontend flow which is mostly controlled by dispatch rules, the backend process is suitable for real scheduling. A scheduling system for the backend of Infineon Technologies Dresden based on a Discrete Event Simulation (DES) system was developed and tested in the real industrial environment. The simulation model is automatically generated from the databases of the manufacturer. The system is used for short term scheduling - from one shift up to one week. The paper will focus on the aspect of optimizing the process flow and calculating exact release dates for lots. The basic principles are applicable not only in the semiconductor industry but also in other industrial sectors.
引用
收藏
页码:1741 / +
页数:3
相关论文
共 50 条
  • [1] Application of simulation-based scheduling in a semiconductor backend facility
    Horn, Sven
    Weigert, Gerald
    Schoenig, Petra
    Thamm, Gerolf
    ESTC 2006: 1ST ELECTRONICS SYSTEMINTEGRATION TECHNOLOGY CONFERENCE, VOLS 1 AND 2, PROCEEDINGS, 2006, : 1122 - +
  • [2] Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor Backend facility
    Weigert, G.
    Klemmt, A.
    Horn, S.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (08) : 2165 - 2184
  • [3] A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly
    Yin, XF
    Chua, TJ
    Wang, FY
    Liu, MW
    Cai, TX
    Yan, WJ
    Chong, CS
    Zhu, JP
    Lam, MY
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2004, 17 (08) : 733 - 749
  • [4] Development and Implementation of an Advanced Planning & Scheduling (APS) System for Semiconductor Backend Assembly
    T J Chua
    T X Cai
    F Y Wang
    William Liu
    X F Yin
    W J Yan
    J P Zhu
    Joanne Lam
    厦门大学学报(自然科学版), 2002, (S1) : 189 - 190
  • [5] Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility
    Potoradi, J
    Boon, OS
    Mason, SJ
    Fowler, JW
    Pfund, ME
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1857 - 1861
  • [6] A Simulation Based Optimization Approach for Scheduling of a Semiconductor Manufacturing System
    Gao, Hai
    Qiao, Fei
    Ma, Yumin
    Kong, Lingyi
    2014 IEEE INTERNATIONAL CONFERENCE ON SYSTEM SCIENCE AND ENGINEERING (ICSSE), 2014, : 251 - 254
  • [7] A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing
    Sivakumar, AI
    Chong, CS
    COMPUTERS IN INDUSTRY, 2001, 45 (01) : 59 - 78
  • [8] PARALLEL SIMULATION-BASED OPTIMIZATION ON SCHEDULING OF A SEMICONDUCTOR MANUFACTURING SYSTEM
    Ma, Yumin
    Qiao, Fei
    Yu, Wei
    Lu, Jianfeng
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 2571 - 2579
  • [9] A Modular Simulation System for Semiconductor Manufacturing Scheduling
    Li, Li
    Qiao, Fei
    PRZEGLAD ELEKTROTECHNICZNY, 2012, 88 (1B): : 12 - 18
  • [10] Simulation based cause and effect analysis of cycle time distribution in semiconductor backend
    Sivakumar, AI
    PROCEEDINGS OF THE 2000 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2000, : 1464 - 1471