Simulation based scheduling system in a semiconductor backend facility

被引:13
|
作者
Werner, Sebastian [1 ]
Horn, Sven [2 ]
Weigert, Gerald [2 ]
Jaehnig, Thomas [3 ]
机构
[1] Infineon Technol, D-01099 Dresden, Germany
[2] Tech Univ Dresden, Elect Packaging Lab, D-01062 Dresden, Germany
[3] Qimonda, D-01099 Dresden, Germany
关键词
D O I
10.1109/WSC.2006.322950
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The semiconductor manufacturing process is usually divided in two parts: frontend and backend. In contrast to the frontend, where the manufacturing process is dominated by cluster-tools and cyclic routes, the backend has a predominant linear structure. In contrast to the frontend flow which is mostly controlled by dispatch rules, the backend process is suitable for real scheduling. A scheduling system for the backend of Infineon Technologies Dresden based on a Discrete Event Simulation (DES) system was developed and tested in the real industrial environment. The simulation model is automatically generated from the databases of the manufacturer. The system is used for short term scheduling - from one shift up to one week. The paper will focus on the aspect of optimizing the process flow and calculating exact release dates for lots. The basic principles are applicable not only in the semiconductor industry but also in other industrial sectors.
引用
收藏
页码:1741 / +
页数:3
相关论文
共 50 条
  • [41] SIMULATION-BASED WIP MANAGEMENT VERSUS SCHEDULING FOR SEMICONDUCTOR MANUFACTURING - A COMPARISON
    Lendermann, Peter
    Gan, Boon Ping
    Lee, Loo Hay
    2014 E-MANUFACTURING AND DESIGN COLLABORATION SYMPOSIUM (EMDC), 2014,
  • [42] Modeling and real-time scheduling of semiconductor manufacturing line based on simulation
    Wang, Zhongjie
    Jiang, Xinhua
    Wu, Qidi
    BIO-INSPIRED COMPUTATIONAL INTELLIGENCE AND APPLICATIONS, 2007, 4688 : 579 - +
  • [43] Scheduling semiconductor wafer fabrication by using ordinal optimization-based simulation
    Hsieh, BW
    Chen, CH
    Chang, SC
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2001, 17 (05): : 599 - 608
  • [44] AN AGENT-BASED SIMULATION MODEL WITH HUMAN RESOURCE INTEGRATION FOR SEMICONDUCTOR MANUFACTURING FACILITY
    Werling, Joris
    Yugma, Claude
    Soukhal, Ameur
    Mohr, Thierry
    2020 WINTER SIMULATION CONFERENCE (WSC), 2020, : 1801 - 1812
  • [45] A SIMULATION-BASED APPROACH FOR AN EFFECTIVE AMHS DESIGN IN A LEGACY SEMICONDUCTOR MANUFACTURING FACILITY
    Ben-Salem, Ali
    Yugma, Claude
    Troncet, Emmanuel
    Pinaton, Jacques
    2017 WINTER SIMULATION CONFERENCE (WSC), 2017, : 3600 - 3611
  • [46] A SIMULATION BASED SCHEDULING IN BUS RAPID TRANSIT SYSTEM
    Pekel, Engin
    Kara, Selin Soner
    SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2015, 33 (01): : 66 - 76
  • [47] A simulation-based finite capacity scheduling system
    Weintraub, AJ
    Zozom, A
    Hodgson, TJ
    Cormier, D
    PROCEEDINGS OF THE 1997 WINTER SIMULATION CONFERENCE, 1997, : 838 - 844
  • [48] An online, simulation-based patient scheduling system
    Manansang, H
    Heim, JA
    1996 WINTER SIMULATION CONFERENCE PROCEEDINGS, 1996, : 1170 - 1175
  • [49] Intelligent simulation-based lot scheduling of photolithography toolsets in a wafer fabrication facility
    Arisha, A
    Young, P
    PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2004, : 1935 - 1942
  • [50] A simulation based performance analysis of scheduling in a parallel system
    Karatza, HD
    SIMULATION IN INDUSTRY'2000, 2000, : 582 - 586